Fuel Efficient Cooking in South Africa
#9of 12 in South Africa#532of 629 in Verra (VCS)#31of 38 in VMR0006
Audit Analysis
This VCS cookstove project in South Africa has a verified additionality assessment and no reported reversal events, but is undermined by 26 material findings, 26 corrective actions, and nine cross-document contradictions covering leakage, fNRB method, FPIC, and benefit-sharing. The project-specific baseline, absence of a stated buffer pool, and a 10% gap between assumed and verified usage rates introduce meaningful over-crediting risk. Documentation is voluminous (48 sources) but riddled with missing spreadsheets, broken links, and inconsistent values that erode confidence in the reported figures.
Red Flags
- 26 material findings and 26 corrective actions identified by the VVB, including calculation errors in stove-days, #REF! errors in the ERR spreadsheet, and households with non-woody biomass baselines initially included in ER claims
- Leakage deduction contradicts between documents: the verification report states 0% while the more recent monitoring report states 5%, with the justification shifting from 'not addressed' to 'quantified' across verification cycles
- fNRB method is contradictory: one verification report (May 2024) records it as 'not applicable' while an earlier one (Mar 2024) records 'local field', yet the fNRB value of 0.88 is used in calculations
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified
- FPIC status is contradictory: the verification report (Feb 2026) confirms it was conducted, but the monitoring report (Jan 2026) records it as not conducted
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 98,995 | 98,995 | 0 | |
| 2022 | 805,990 | 805,990 | 0 | |
| 2023 | 2,575,966 | 2,575,966 | 0 | |
| 2024 | 3,569,698 | 3,569,698 | 0 | |
| 2025 | 2,418,301 | 263,288 | 2,155,013 | |
| Total | 9,468,950 | 7,313,937 | 2,155,013 |
Risk Indicators
Combined test, VVB-confirmed
No buffer pool stated; no reversals
0% vs 5% contradiction across docs
Project-specific; no reassessment date
FPIC contradiction; grievance present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →