Distribution of Improved Cook Stoves in Sub-Saharan Africa–Zambia-CPA-005
#20of 60 in Cookstoves#1of 7 in Zambia#206of 629 in Verra (VCS)#13of 38 in VMR0006
Audit Analysis
A VCS cookstove project in Zambia with a confirmed combined additionality test, quantified 5% leakage deduction, and no material findings. However, the project relies on a project-specific baseline, no buffer pool is documented, and multiple data contradictions across the PDD, verification report, and issuance documents create uncertainty around the verified emission reduction figures. The project delivered roughly 56% of the pro-rata expectation for the elapsed monitoring period, which is conservative but raises questions about the accuracy of the ex-ante estimates.
Red Flags
- The verification report (Oct 2024) records a verified ERR of 685,565 tCO2e, which is identical to the lifetime claimed ERR in the PDD, while the issuance document (Oct 2024) records 76,174 tCO2e — a 9× discrepancy that strongly suggests a data transcription error in the verification report
- No buffer pool percentage is stated in any available document, leaving permanence risk for cookstove breakage, loss, or abandonment unaddressed
- The PDD (Aug 2024) records a verified usage rate of 0.0199 (≈2%) and an assumed usage rate of 0, which are physically implausible for a cookstove project and contradict the issuance figure of 93.26% — likely a data extraction or transcription error, but it undermines confidence in the PDD's internal consistency
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
No buffer pool documented
5% quantified deduction
Project-specific, no reassessment date
FPIC, grievance mechanism, benefit sharing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →