Skip to main content
VCSEnergy demandCongo, The Democratic Republic of The Registry: RegisteredVMR0006

Eastern DRC Cookstove Project - South Kivu

VCS-2636 ↗

#13of 60 in Cookstoves#167of 629 in Verra (VCS)#10of 38 in VMR0006

6.0/ 10
Integrity
6.2
Transparency
6.8
Claim Safety
4.8
Documentation
6.2

Audit Analysis

The Eastern DRC Cookstove Project demonstrates solid additionality (VVB-confirmed investment test) and no reversal events, but is held back by a project-specific baseline with no stated reassessment date, a contradictory and ultimately missing leakage justification, and multiple cross-document discrepancies in ERR figures and crediting period dates. The 97.5% verified-to-claimed ratio for the 2023 monitoring period is reassuring, yet the absence of a buffer pool, unverified usage rates, and unknown CORSIA/CCP status leave moderate over-crediting and double-claiming risk.

Red Flags

  • Leakage justification is contradictory: the 2023-10-13 verification report states leakage was 'quantified,' but the later 2024-04-11 verification report records it as 'not_addressed' despite a 5% deduction being applied
  • Two different total ERR verified figures appear (661,779 in the 2024-04-11 verification report vs 422,148 in the 2023-12-08 monitoring report), a 57% gap that is not explained in the extracted record
  • Crediting period dates differ between the PDD (2020-02-01 to 2027-01-31) and the verification report (2020-06-10 to 2027-06-09), creating ambiguity about the exact project duration
  • Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified
  • Feedstock (wood) sustainability is not addressed in the extracted record for a project whose entire credit claim depends on displaced firewood

Credit Vintages

IssuedRetiredAvailable
2020
20,66520,6650
2021
169,235169,2350
2022
422,1480422,148
2023
661,7790661,779
Total1,273,827189,9001,083,927

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversals but buffer pool not stated

Leakage

5% deduction applied but justification missing

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents