Skip to main content
VCSEnergy demandIndia Registry: RegisteredVMR0006

Clean Cooking Access for Women in Rural Maharashtra

VCS-3151 ↗

#47of 60 in Cookstoves#335of 387 in India#556of 629 in Verra (VCS)#33of 38 in VMR0006

4.2/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
3.5
Documentation
3.5

Audit Analysis

A VCS-registered cookstove project in rural Maharashtra with confirmed additionality and a reasonable 5% leakage deduction, but significant documentation gaps including low extraction confidence, no monitoring data, and an unaddressed leakage justification in the final validation report. The project-specific baseline and absence of usage-rate data limit confidence in the 20.6 MtCO₂e lifetime claim.

Red Flags

  • Leakage justification marked as 'not addressed' in the final validation report (Aug 2024) despite a 5% deduction being applied — the earlier validation (Apr 2024) described it as 'quantified', suggesting the justification was lost or removed
  • Low extraction confidence across the document set, with one document of unknown type, undermining reliability of the extracted record
  • No monitoring or verification report available; the project is registered but zero verified emissions reductions have been reported
  • 23 Corrective Action Requests were raised during validation, indicating material documentation deficiencies that had to be remediated

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed common-practice test

Permanence

N/A – energy demand, no storage

Leakage

5% deduction but justification missing in final validation

Baseline

Project-specific, not jurisdictional

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents