The Philippines VWT Improved Cookstove Program I
#97of 150 in Cookstoves#10of 19 in Philippines#929of 1339 in Verra (VCS)#69of 103 in VMR0006
Audit Analysis
The Philippines VWT Improved Cookstove Program I is a registered VCS cookstove project with a quantified 5% leakage deduction and no reported reversals, but it carries a heavy burden of methodological deficiencies identified during validation—including a project start date preceding the baseline survey, an incorrectly referenced additionality tool, and significant fNRB calculation errors. All six corrective action requests were closed and the project was ultimately registered, yet the depth of the initial documentation and methodological gaps, combined with a 16-month delay in the monitoring report, leave meaningful residual uncertainty about the robustness of the underlying credit calculations.
Red Flags
- Cookstove distribution began 05/11/2022, before the baseline survey was completed (28/11/2022–30/03/2023), undermining the temporal integrity of the baseline
- The validation report incorrectly referenced VT0001 (an AFOLU additionality tool) for a cookstove methodology, indicating a fundamental methodological misapplication that required correction
- fNRB value discrepancy of 58% between the PDD (0.87) and the validation report (0.55), with material findings citing inconsistent population data, outdated usage percentages, and an incorrect Wood-to-Charcoal ratio in the original calculation
- The validation report's lifetime ERR figure (4,726,805) is exactly 10× the PDD figure (472,680), suggesting a probable data-entry error that raises questions about the reliability of the ex-ante credit estimate
- WBT testing was conducted on only one stove in Bangladesh, raising concerns about representativeness for cookstoves deployed in the Philippines
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but originally misapplied tool; project starte
mixed evidence / unresolved risk
5% quantified deduction with stated justification
Project-specific baseline; established after project start;
FPIC conducted, grievance mechanism present, safeguards docu
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →