Skip to main content
VCSEnergy demandTanzania Registry: RegisteredVMR0006

Installation of high efficiency wood burning cookstoves in Tanzania 2

VCS-3209 ↗

#103of 150 in Cookstoves#9of 19 in Tanzania#955of 1339 in Verra (VCS)#75of 103 in VMR0006

4.6/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.0
Documentation
4.5

Audit Analysis

A registered VCS cookstove project in Tanzania with VVB-confirmed additionality and quantified leakage, but significant gaps in monitoring data, no buffer pool, and a project-specific baseline. The validation report identified 11 corrective actions and three inter-document contradictions, and the low extraction confidence further limits confidence in the extracted record.

Red Flags

  • No monitoring report or verified ERR found — the 16.3 million claimed lifetime credits remain entirely unverified
  • Eleven corrective actions were required at validation, including a double-counting self-declaration against a similar project (VCS-2366)
  • Three contradictions between the PDD and validation report (additionality test type, leakage rate, crediting period) indicate document inconsistency
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unquantified

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment timing not stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents