GLOBAL COOKSTOVE PROGRAM (EKI - Pink City)
#83of 150 in Cookstoves#653of 975 in India#846of 1339 in Verra (VCS)#60of 103 in VMR0006
Audit Analysis
The Global Cookstove Program (EKI – Pink City) is a VCS-registered cookstove project with VVB-confirmed additionality and a quantified 5% leakage deduction, but it carries significant data-reliability concerns: three cross-document contradictions (including a 24× discrepancy in claimed ERR), seven unresolved corrective actions, and a null verified-ERR figure that prevents any delivery check. The project is very early in its 7-year crediting period (only ~5 months of monitoring), and the absence of buffer-pool or permanence data for a cookstove project is a notable gap.
Red Flags
- 24× discrepancy in total ERR between the PDD (68,477 tCO₂e, June 2024) and an unidentified earlier document (1,622,675 tCO₂e, May 2023) — the source and basis of the larger figure are unexplained
- Seven corrective actions remain open, including database anomalies where multiple entries appear to belong to the same beneficiary, undermining unique-stove identification
- Total verified ERR is not available in the extracted record, making it impossible to confirm whether the project is delivering on its ex-ante estimate
- fNRB calculation method changed between the PDD (national default) and the verification report (state-level), and the VVB has not yet received the final fNRB calculation sheet
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific; reassessment date not stated
Grievance mechanism present; FPIC not confirmed; stakeholder consultation flagged
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →