Sequoia cookstoves in Benin
#106of 150 in Cookstoves#6of 7 in Benin#966of 1339 in Verra (VCS)#77of 103 in VMR0006
Audit Analysis
The Sequoia cookstove project in Benin is a standard VCS energy-demand project with a reputable VVB (Applus+) and a reasonable 5% leakage deduction, but the available record consists solely of a validation report with ten material findings (several concerning baseline evidence and monitoring plan adequacy) that were subsequently resolved via corrective actions. No monitoring or verification report is present, so actual delivery cannot be assessed, and multiple parameter contradictions between the PDD and validation report reduce confidence in the underlying data.
Red Flags
- Ten material findings in the validation report, including 'lack of evidence to support the project baseline scenario' and 'insufficient information on the monitoring plan', indicate the initial submission was materially deficient (resolved via CARs but still a quality signal).
- No monitoring or verification report is present in the extracted record; the project's crediting period began in March 2023, yet no actual delivery data is available to confirm the 6,663,125 tCO₂e claim.
- The validation report is dated 2024-08-13 while the crediting period started 2023-03-20, creating a timeline inconsistency that is unexplained in the available documents.
- Multiple parameter contradictions (usage rate 80% vs 90%, fNRB method national-default vs local-field, additionality test type combined vs barrier) reduce confidence in the project's internal consistency.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
N/A – no carbon stock to reverse
5% quantified deduction
Project-specific; evidence gap flagged in validation
Grievance & benefits sharing present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →