Improved Cookstove Implementation in Nepal.
#61of 150 in Cookstoves#37of 101 in Nepal#658of 1339 in Verra (VCS)#45of 103 in VMR0006
Audit Analysis
A VCS cookstove project in Nepal with VVB-verified additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline, five cross-document contradictions, and nine corrective action requests raised during validation. The project delivered roughly 74% of its pro-rata ex-ante expectation for the monitoring period, which is conservative, yet the unresolved fNRB method discrepancy and missing usage-rate data leave material uncertainty in the credit calculation.
Red Flags
- Five contradictions between the PDD and validation/verification reports span ERR figures, additionality test type, fNRB method, and crediting-period start date, indicating inconsistent project documentation.
- Nine corrective action requests and two clarification requests were raised during joint validation and verification, covering thermal efficiency values, fNRB calculation, additionality demonstration, and monitoring parameters — all closed but signalling significant initial methodological gaps.
- The fNRB method is stated as a national default (0.86) in the validation report but as a local field measurement in the PDD, and a material finding explicitly flags a 'lack of assessment and information on calculation of fNRB.'
- Usage rate (both assumed and verified) is not stated in any available document, leaving a key input to the ERR calculation unverified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 6,105 | 6,105 | 0 | |
| 2022 | 10,000 | 4,015 | 5,985 | |
| Total | 16,105 | 10,120 | 5,985 |
Risk Indicators
VVB-confirmed investment test
Non-AFLOU
5% quantified deduction
Project-specific; reassessment date not stated
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →