Vai al contenuto principale
VCS Energy demand Malawi Registry: Registered Documentazione completa General Methodology v2.0

Installation of high efficiency wood burning cookstoves in Malawi - Project 2

VCS-2372 ↗

4.3 / 10
Integrity
4.5
Transparency
5.5
Claim Safety
3.0
Documentation
4.0

Score Breakdown

Integrity

missing multiple material findings and 3–4 corrective action requests required by the VVB (issuance report, 2025-11-06)

verified additionality was confirmed by the VVB and an activity test was used (verification report cited in merged record)

Transparency

verified VVB named (Carbon Check (India) Private Ltd.) and monitoring period given (2020-07-05 — 2023-02-28)

inferred ✗ min extraction confidence is medium and evidence documents listed as unknown despite 60 documents, reducing traceability

Claim Safety

missing material findings question accuracy of ERR calculations and operational stove proportion (verification/issuance documents)

verified project reported CORSIA not eligible, reducing dual-claim risk

Documentation

verified large document set used (n=60) and recent issuance date (2025-11-06)

missing baseline reassessment date not stated and several CARs/assessment findings remain or required closure

Detailed Analysis

Integrity

The VVB confirmed additionality using an activity test and the VVB name is provided (verification/issuance documents), which supports basic additionality. However, there are numerous material findings targeting the accuracy of fuel-use parameters and the proportion of operational cookstoves, and multiple corrective-action requests require cross-checking raw monitoring data and sampling methods (issuance report, 2025-11-06). Baseline methodology is project-specific and baseline reassessment timing is not stated in available documents, which reduces confidence in baseline validity and permanence treatment.

Transparency

The project provides a named VVB (Carbon Check) and a clear monitoring period (2020-07-05 — 2023-02-28) and the reported claimed and verified emission reduction figure in the primary record are identical (144,965), supporting internal consistency in the cited issuance. However, evidence documents are listed as 'unknown' in the extracted record, min extraction confidence is medium, and important metadata (baseline reassessment date, grid EF year) are not found in the extracted record, lowering transparency.

Claim Safety

The project is reported as not CORSIA-eligible, reducing immediate dual-claim risk. The FNRB approach uses national defaults and an FNRB value of 0.91 is reported, which is transparent, but assumptions on usage rates are partially missing (usage_rate_assumed not stated) and the verification flagged accuracy issues in ERR calculations. Those findings raise over-crediting risk until corrective actions and data cross-checks are completed (issuance report findings and CARs).

Documentation

There is a large document set (n=60) and a recent issuance date (2025-11-06), but minimum extraction confidence is only medium and evidence_docs are recorded as unknown. Several CARs and many assessment findings were raised; some were closed but many require resolution. The VVB independence is clear (named), but missing baseline reassessment information and unresolved findings reduce the documentation score.

Overall

I privileged the values from the more recent documents (those with later dates in the contradictions list) because they likely reflect the final verification/issuance position: for example, I used the 144,965 ERR claimed/verified figure (document dated 2024-10-07) rather than the 1,100,453 figure dated 2024-10-05 because the later record aligns with the issuance report (2025-11-06). For usage rate the 0.871 value (2024-10-07) was chosen over 87.1 (likely a unit/reporting error on 2024-09-06). For procedural items (FPIC, safeguards, grievance mechanism, benefit sharing, reversal events, and usage monitoring method) I favored the later-document values (dated October 2024) which report FPIC conducted, safeguards mentioned, grievance mechanism present, reversal events none reported, and annual survey monitoring rather than earlier documents that reported these as absent or self-reporting. These contradictions reduce confidence and required downgrades to scores because they indicate inconsistent reporting across documents and unresolved issues flagged by the VVB. The medium extraction confidence and many outstanding assessment findings/CARs further reduce the overall score to a conservative mid-range rating.

Audit Analysis

The project shows some procedural strengths (VVB verification of additionality, quantified leakage justification, VVB name present) but multiple material findings and several corrective-action requests undermine confidence in the emission reductions. Documentation exists (60 documents) but extraction confidence is only medium and key baseline/reassessment information is missing.

Project Description

Proponent: Bridge Carbon Africa Stoves Development Private Limited Protocol categories: Energy demand Protocols: VMR0006 Estimated annual GHG reductions: 1924569 tCO2e Region: Africa Registration date: 2021-11-12

Red Flags

  • Multiple material findings and several corrective action requests on monitoring and ERR calculations
  • Contradictory ERR figures (144,965 vs 1,100,453) across documents indicating data reliability issues

Credit Vintages

Issued Retired Available
2020
22,208 4,175 18,033
2021
628,392 326,600 301,792
2022
2,955,081 2,072,373 882,708
2023
798,535 48,042 750,493
Total 4,404,216 2,451,190 1,953,026

Cosa migliorerebbe questo punteggio

  • Resolve and publish responses to all VVB assessment findings and close outstanding corrective actions with supporting raw monitoring data and sampling documentation.
  • Publish clear baseline reassessment dates and full evidence package (monitoring raw data, survey design, FPIC documentation, grievance details) with higher extraction confidence so third parties can reproduce ERR calculations.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed activity test

Permanence

buffer/reversal treatment unclear

Leakage

quantified leakage deduction

Baseline

project baseline, reassessment not stated

Safeguards

FPIC/grievance mentioned but documentation inconsistent

Double-claim

not CORSIA-eligible

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
VCS-2372 ↗

Registry Documents

Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti