Improved Cookstove Distribution in Kenya by EKI Phase 01
#123of 150 in Cookstoves#128of 157 in Kenya#1069of 1339 in Verra (VCS)#88of 103 in VMR0006
Audit Analysis
This VCS cookstove project in Kenya has a confirmed additionality assessment and a reputable VVB (RINA Services), but is undermined by a 70% downward revision of the lifetime emission-reduction estimate, a contradictory 0% leakage deduction labelled 'quantified,' and an unusually high volume of material findings and corrective actions (31 CARs) that raise serious questions about the robustness of the monitoring data and the reliability of the verified credits.
Red Flags
- The lifetime ex-ante emission-reduction estimate was revised down from 536,782 tCO₂e (validation report, Jan 2024) to 162,437 tCO₂e (verification report, Jan 2025), a 70% reduction that suggests the initial validation was significantly over-optimistic.
- The verification report records a 0% leakage deduction while the monitoring report (Jan 2025) records 5%, and the justification is labelled 'quantified'—a direct contradiction that undermines confidence in the leakage treatment.
- 31 corrective action requests and over 30 material findings were raised during validation and verification, including substantive issues such as unremoved outliers, unexplained sample-size discrepancies (125 selected vs 104 surveyed), missing lag-day adjustments in the ER calculation, and non-replicable fuel-saving data analysis.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 1 | 0 | 1 | |
| 2024 | 1 | 0 | 1 | |
| Total | 2 | 0 | 2 |
Risk Indicators
VVB-confirmed combined test
N/A for cookstoves
0% vs 5% contradiction; 'quantified' label inconsistent
Project-specific; 70% downward revision
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →