Vai al contenuto principale
VCS Energy demand Kenya Registry: Registered Documentazione completa General Methodology v2.0

Kenya Jiko Kisasa Improved Cookstove Program I

VCS-3197 ↗

5.5 / 10
Integrity
6.4
Transparency
5.6
Claim Safety
5.0
Documentation
4.3

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the monitoring report reports no material findings.

missing The baseline is project-specific rather than a clearly standardized or recently reassessed baseline, and reversal events are not addressed.

Transparency

verified The monitoring report provides a verified emission reduction figure of 94,580 and a defined monitoring period from 2022-06-21 to 2024-06-20.

missing The extracted record shows low extraction confidence, no claimed-vs-verified comparison, and no clear public registry completeness signals beyond the VCS registration.

Claim Safety

verified Leakage is quantified with a 0.95% deduction, and verified usage is very high at 99.38% in the monitoring report.

missing The baseline method is project-specific, the FNRB uses a national default value of 0.89, and CORSIA eligibility is false but CCP status is not stated.

Documentation

verified Twenty-six documents were used, and the monitoring report is recent, dated 2026-06-01.

missing Low extraction confidence indicates at least one key document was hard to read, and several important fields such as buffer pool, baseline reassessment, and total claimed reductions are not found in the extracted record.

Detailed Analysis

Integrity

The monitoring report confirms additionality through VVB review, and it reports no material findings or corrective actions required. Leakage is not ignored: a 0.95% deduction is stated, which is a positive sign, but the baseline remains project-specific and the record does not show a baseline reassessment date. Reversal risk is weakly documented because reversal events are marked as not addressed and no buffer pool percentage is available.

Transparency

The monitoring report is reasonably informative, with a defined monitoring period and a verified emission reduction total of 94,580. Still, the extracted record has low extraction confidence, and the total claimed reductions are not found, so the claimed-versus-verified reconciliation cannot be checked. Registry status is clear as VCS registered, but broader public-data completeness is limited in the extracted materials.

Claim Safety

Claim safety is helped by the quantified leakage deduction and the very high verified usage rate of 99.38%. On the other hand, the baseline method is project-specific rather than standardized, and the FNRB relies on a national default value of 0.89, which leaves some room for over-crediting concern. CORSIA eligibility is explicitly false, which reduces dual-market concern, but CCP status is not stated in the available documents.

Documentation

Documentation is mixed: 26 documents were used and the monitoring report is recent, but the extraction confidence is low, which lowers trust in completeness. Several important items are missing from the extracted record, including buffer pool percentage, baseline reassessment timing, and claimed reductions. The presence of contradictions across documents further weakens confidence in the documentation set.

Overall

I privileged the most recent monitoring report dated 2026-06-01 for facts such as verified emissions, safeguards, and usage, because it is the latest and most specific source in the record. Where contradictions exist, I treated them as evidence of reliability issues rather than assuming the higher value is always correct; for example, FPIC, safeguards, benefit sharing, grievance mechanism, and reversal treatment all conflict across documents, so I discounted documentation and transparency. The low extraction confidence also justifies a downward adjustment, and the absence of a buffer pool and clear reversal treatment keeps the integrity score from being stronger.

Audit Analysis

The project has some solid quality signals, including VVB-confirmed additionality, a quantified leakage deduction, and very high verified usage. However, the evidence base is weakened by low extraction confidence, missing key baseline and permanence details, and contradictions across documents on safeguards and usage monitoring. Overall, this looks like a moderately credible cookstove program, but not one with especially strong documentation or low-risk claims.

Project Description

Proponent: Guangzhou Iceberg Environmental Consulting Services Co., Ltd. Protocol categories: Energy demand Protocols: VMR0006 Estimated annual GHG reductions: 231347 tCO2e Region: Africa Registration date: 2024-02-27

Red Flags

  • No buffer pool percentage is stated, and reversal risk is not clearly addressed even though the project is a cookstove program with long crediting exposure.
  • Several safeguard and implementation facts conflict across documents, including FPIC, grievance mechanism, benefit sharing, and reversal treatment.

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Provide a clear buffer pool or other permanence backstop, plus explicit treatment of any reversal risk for the full crediting period.
  • Publish a reconciled document set that resolves the safeguard contradictions and includes the claimed-versus-verified emissions comparison, baseline reassessment timing, and CCP status.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No buffer pool stated

Leakage

Quantified leakage deduction

Baseline

Project baseline, reassessment missing

Safeguards

Safeguards present but contradictory

Double-claim

Not CORSIA-eligible; CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti