Skip to main content
VCSEnergy demandIndia Registry: RegisteredVMR0006

Global Cookstove Program (EKI Phase 08)

VCS-2946 ↗

#84of 150 in Cookstoves#657of 975 in India#847of 1339 in Verra (VCS)#61of 103 in VMR0006

4.8/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

The Global Cookstove Program (EKI Phase 08) is a VCS-registered energy demand project in India with confirmed additionality and a quantified 5% leakage deduction, but it suffers from a significant ERR discrepancy between the PDD and validation report, absence of any monitoring data, and numerous material findings that required resolution. The project-specific baseline, lack of stated buffer pool, and unknown CORSIA/CCP status introduce moderate over-crediting and double-claiming risks.

Red Flags

  • ERR discrepancy of 7.3× between PDD (353,863 tCO₂e) and validation report (48,690 tCO₂e) — the validated figure is privileged as more recent, but the magnitude of the gap warrants scrutiny of scope changes
  • No monitoring report or verified ERR figure found in the extracted record despite the crediting period starting August 2023
  • 18 material findings at validation including baseline cookstove efficiency, fNRB calculation, and missing data — all resolved but indicating a weak initial submission
  • CORSIA eligibility and CCP status both unknown — dual-channel risk cannot be excluded

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

thin analysis

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment date; material findings

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status both unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents