VCSEnergy demandRwanda Registry: RegisteredVMR0006

Rwandan Improved Cookstove Project

VCS-2984 ↗

#59of 150 in Cookstoves#29of 139 in Rwanda#621of 1339 in Verra (VCS)#43of 103 in VMR0006

5.2/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Rwandan Improved Cookstove Project has a verified investment-test additionality and a quantified 5% leakage deduction, but is undermined by a project-specific baseline, no stated buffer pool, a suspiciously high 100% usage rate, and an extensive list of material findings and corrective actions spanning baseline validation, sampling methodology, and safeguards documentation. The project delivered only about 24% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting but also questioning the original baseline assumptions. Multiple cross-document contradictions and unit errors further erode confidence in the data record.

Red Flags

  • Verified emissions reductions of 484,726 tCO₂e represent only ~24% of the pro-rata ex-ante expectation (~1,999,000 tCO₂e for the 2-year monitoring period out of a 10-year crediting period), raising questions about the validity of the original baseline assumptions
  • 100% usage rate verified in the verification report is implausibly high for a cookstove project and was reported as 1.0 (fraction) in the monitoring report, indicating a unit or interpretation error
  • Stove lifespan is inconsistently reported as 5, 6, or 7 years across the project description, emissions reduction sheet, and verification report
  • Sampling plan used a 90/10 confidence level instead of the required 95/10 for large projects, as flagged in the verification report

Credit Vintages

IssuedRetiredAvailable
2022
21,536021,536
2023
216,3970216,397
2024
246,7930246,793
Total484,7260484,726

Risk Indicators

Additionality

Investment test, VVB-verified

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, not yet due for reassessment

Safeguards

FPIC and grievance present, but 30+ findings on safeguards documentation

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents