Vai al contenuto principale
VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

Clean Cooking - Cook Stove for Rural India

VCS-2942 ↗

3.5 / 10
Integrity
3.2
Transparency
4.0
Claim Safety
3.8
Documentation
3.2

Score Breakdown

Integrity

missing Multiple corrective actions and material findings reported in the monitoring report (2025-10-03) related to baseline survey, thermal efficiency and fNRB calculation

inferred ~Additionality was confirmed by a VVB in later documents (VVB: RINA) but earlier records contradict that — lowers confidence

Transparency

verified VVB named (RINA) and a recent monitoring report dated 2025-10-03 is available with verified ERR (148,546) reported

missing Key items missing or not stated publicly in extracted record: buffer pool percentage, total ERR claimed, and grid emission factor; extraction confidence is low

Claim Safety

verified Project is reported not CORSIA‑eligible (reduces double‑claim risk) and uses a project baseline method (VMR0006) which is appropriate for cookstoves

missing fNRB method and value show contradictions (local field method and national default both appear in documents) and leakage justification is inconsistent — increases over‑crediting risk

Documentation

verified Large document set used (46 docs) and a recent monitoring report (2025-10-03) exists

missing Minimum extraction confidence flagged as low and many corrective actions remain; several contradictions across documents reduce documentation reliability

Detailed Analysis

Integrity

The monitoring report (2025-10-03) and VVB involvement (RINA) provide some procedural integrity, but the report records numerous material findings and corrective actions concerning baseline identification, thermal efficiency measurement and fNRB calculation. Leakage is stated as not addressed in the latest documents and no leakage deduction percentage is provided in the extracted record. Reversals are not addressed. These combined shortcomings justify a low integrity score.

Transparency

A named VVB (RINA), a monitoring period (2024-01-01 — 2025-08-31) and a verified ERR figure (148,546) are present in the monitoring report (2025-10-03). However, several transparency-relevant items are missing from the extracted record: buffer pool percentage, total ERR claimed, grid emission factor and some monitoring assumptions. The minimum extraction confidence is low, which further reduces transparency.

Claim Safety

The project is reported as not CORSIA‑eligible, lowering double‑claim risk. However, contradictions in the fNRB method (local field versus national default) and uncertainty in usage-rate monitoring (assumed/verified usage not clearly available) raise over‑crediting concerns. Leakage treatment is inconsistent across documents, increasing claim risk.

Documentation

Although 46 documents were used and the latest monitoring report is dated 2025-10-03, the record shows low extraction confidence and many outstanding corrective actions required from the VVB. Several fields are explicitly not stated in the extracted record (e.g., buffer pool percentage, grid emission factor) and the existence of contradictions between documents (see below) lowers the documentation score.

Overall

I privileged the values from the most recent and explicitly dated monitoring report (2025-10-03) where available. Specific contradictions: (1) fNRB method — I privileged the local field method as reported in the merged facts and dated 2023-11-16, but flagged the contradiction because a national default was also recorded elsewhere; this raises uncertainty in applied emission factors. (2) Additionality verification — later documentation (2024-12-04) indicates additionality was confirmed by a VVB, but an earlier record (2024-05-30) showed it was not; I privileged the later confirmation but reduced integrity score for the contradiction and traceability concerns. (3) Leakage — an earlier document (2024-09-27) indicated leakage had been quantified, but a more recent entry (2024-11-29) states leakage is not addressed; I privileged the more recent not‑addressed status, which reduces leakage and claim safety scores. (4) FPIC, safeguards, benefit sharing and grievance mechanism show contradictions between older and newer records; I privileged the most recent entries (FPIC, safeguards, benefit sharing and grievance mechanism present in 2025-10-03) but this inconsistency and the low extraction confidence reduce overall reliability. Because integrity is below 4.0, a gate rule would cap overall at a maximum of 6.0; the calculated weighted overall score before any post-processing is about 3.6, reflecting the combination of the issues described.

Audit Analysis

The project shows some positive elements (VVB involvement, recent monitoring report, FPIC and grievance mechanism reported) but has significant integrity and documentation weaknesses: multiple corrective action requests, unanswered questions on baseline and leakage, and extraction confidence flagged as low. These gaps create risk of over‑crediting and reduce confidence in reported emission reductions.

Project Description

Proponent: Multiple Proponents Protocol categories: Energy demand Protocols: VMR0006 Estimated annual GHG reductions: 50552 tCO2e Region: Asia Registration date: 2024-01-16

Red Flags

  • Multiple corrective action requests and material findings regarding baseline, fNRB calculation and thermal efficiency
  • Leakage not addressed in the latest documents and no leakage deduction provided
  • Low extraction confidence reported (key documents poorly readable)

Credit Vintages

Issued Retired Available
2022
148,546 12,575 135,971
Total 148,546 12,575 135,971

Cosa migliorerebbe questo punteggio

  • VVB should close outstanding corrective actions with documented evidence: provide baseline survey details, fNRB calculation spreadsheet, thermal efficiency validation and weighing scale calibration records.
  • Publish or extract clear values for buffer pool percentage, leakage deduction (or robust justification of negligible leakage), total ERR claimed, and the grid emission factor; and resolve contradictory records with dated, authoritative documents.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed but contradictory records

Permanence

buffer/reversal not clearly addressed

Leakage

leakage not addressed in latest docs

Baseline

project baseline present but reassessment/details missing

Safeguards

FPIC and grievance mechanism reported

Double-claim

not CORSIA‑eligible

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti