Sequoia Improved cookstoves project in Togo
#70of 150 in Cookstoves#3of 15 in Togo#741of 1339 in Verra (VCS)#51of 103 in VMR0006
Audit Analysis
The Sequoia cookstove project in Togo has a VVB-confirmed investment additionality test and a quantified 5% leakage deduction, but is undermined by 27 material findings, 21 corrective actions, and multiple cross-document contradictions on key parameters (fNRB value, fNRB method, additionality test type). The project delivered only about 7% of its pro-rata ex-ante expectation for the first monitoring period, which is conservative but raises questions about the original estimate's accuracy. The 90% usage rate remains unverified, and CORSIA/CCP eligibility is not stated.
Red Flags
- 27 material findings and 21 corrective actions (4 CARs, 11 CLs) indicate significant data quality and documentation issues across the verification cycle
- fNRB value reported as 74.2 in the verification report but 0.742 in the monitoring report — a 100× discrepancy that, even if a unit error, signals poor internal consistency
- Additionality test type is 'investment' in the verification report but 'combined' in the PDD, and fNRB method is 'national_default' in the VR but 'local_field' in the PDD
- 90% usage rate assumed in the ex-ante estimate but not verified in the monitoring report
- Project delivered only ~7% of the pro-rata ex-ante expectation for the elapsed monitoring period (98,536 vs ~1,457,000 expected), suggesting the lifetime estimate of 5,796,120 tCO₂e may be overly optimistic
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,395 | 0 | 1,395 | |
| 2023 | 58,280 | 0 | 58,280 | |
| 2024 | 38,861 | 0 | 38,861 | |
| Total | 98,536 | 0 | 98,536 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific baseline, not yet due for 10-yr reassessment
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →