Biomass Cookstove Project in Jharkhand
#22of 60 in Cookstoves#135of 387 in India#242of 629 in Verra (VCS)#15of 38 in VMR0006
Audit Analysis
A registered VCS biomass cookstove project in Jharkhand with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline with no stated reassessment date, contradictory FPIC findings across verification reports, and significant inconsistencies in emissions-reduction figures across the PDD and monitoring report. The project is not CORSIA-eligible and uses a conservative FNRB in monitoring, but the absence of buffer-pool details, usage-rate data, and CCP status leaves material gaps in the permanence and claim-safety picture.
Red Flags
- FPIC status is contradictory: the 2022-12-12 verification report states FPIC was conducted, while the later 2022-12-22 verification report states it was not; the later document is privileged, indicating FPIC was not conducted.
- Emissions-reduction figures are inconsistent across documents: the PDD reports 7,659 tCO₂e (claimed) and 11,507 tCO₂e (verified), while the 2024 monitoring report reports 6,730 tCO₂e for a single 12-month period; the basis of comparison (lifetime vs. annual) is unclear from the extracted record, creating over-crediting risk.
- FNRB value differs between the verification report (0.91, national default) and the monitoring report (0.8082); while the lower monitoring value is conservative, the unexplained shift weakens baseline consistency.
- No buffer-pool percentage or reversal-event history is stated in any available document, leaving permanence risk unquantified for a cookstove project where stove failure or abandonment could reverse avoided emissions.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 265 | 265 | 0 | |
| 2021 | 5,601 | 5,601 | 0 | |
| 2022 | 6,849 | 1,819 | 5,030 | |
| 2023 | 1,674 | 111 | 1,563 | |
| Total | 14,389 | 7,796 | 6,593 |
Risk Indicators
VVB-confirmed combined test
No buffer pool or reversal data stated
5% quantified deduction
Project-specific, no reassessment date
Grievance present; FPIC not conducted
CORSIA excluded; CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →