Improved Cookstove Distribution in Malawi by EKI Phase 01
#95of 150 in Cookstoves#59of 92 in Malawi#921of 1339 in Verra (VCS)#68of 103 in VMR0006
Audit Analysis
The EKI cookstove project in Malawi has a confirmed additionality assessment and documented safeguards (FPIC, grievance mechanism), but the verification report lists 22 material findings and 9 corrective action requests covering baseline data, fNRB calculation, monitoring methodology, and project boundary gaps. A contradiction between the verification report (0% leakage) and the monitoring report (5% leakage) introduces uncertainty in the credit quantity, and the project-specific baseline with no stated reassessment date adds conservatism concerns. Overall, the project is functional but carries moderate quality and data-reliability risks.
Red Flags
- 22 material findings and 9 corrective action requests raised by RINA Services, including missing fNRB calculation details, insufficient baseline survey data, and unclear monitoring methodology
- Leakage deduction contradiction: verification report states 0% while the monitoring report states 5%, creating uncertainty in the net credit quantity
- Ex-ante lifetime ERR discrepancy: validation report states 639,162 tCO₂e while the monitoring report states 151,837 tCO₂e, a 76% difference that undermines confidence in the credit ceiling
- Benefit-sharing description contradicts between the validation report (described) and the verification report (not described)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 1 | 0 | 1 | |
| 2024 | 1 | 0 | 1 | |
| Total | 2 | 0 | 2 |
Risk Indicators
VVB-confirmed combined test
reversals marked N/A
0% vs 5% contradiction between documents
Project-specific; reassessment date not stated
FPIC done; grievance mechanism present
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →