IMPROVED COOKSTOVES DISTRIBUTION IN ANGOLA

VCS-4879 ↗

#116of 150 in Cookstoves#1040of 1339 in Verra (VCS)#82of 103 in VMR0006

4.4/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
3.5
Documentation
4.5

Audit Analysis

The cookstove distribution project in Angola has a VVB-verified additionality assessment and quantified leakage, but is undermined by an extensive list of material findings (over 50 items) touching on baseline validity, stove lifespan versus the 10-year crediting period, a fuel-switch deviation, and non-transparent emission-reduction calculations. Multiple key figures (fNRB, leakage rate, usage rate, ex-ante lifetime reductions) show contradictions across documents, and the first-year verified reductions represent only about 8% of the pro-rata annual expectation, raising over-crediting concerns. The project is registered and operational, but the depth of unresolved documentation and methodological issues warrants caution.

Red Flags

  • Stove lifespan justification versus the 10-year crediting period was flagged as a material finding and remains an unresolved permanence risk
  • A fuel-switch deviation was observed in the Luanda region (firewood baseline, charcoal stove), undermining baseline validity for affected households
  • Leakage deduction is reported as 0.95% in the verification report but 5% in the monitoring report — a five-fold discrepancy with no reconciliation
  • Usage rate was assumed at 100% in the ex-ante estimate but verified at only 73%, indicating a 27% over-crediting gap if the assumption is carried forward
  • Ex-ante lifetime reductions differ by 70% between the PDD (1,641,000 tCO2e) and the monitoring report (2,800,000 tCO2e), with no documented rationale for the revision

Credit Vintages

IssuedRetiredAvailable
2024
18,02915,4952,534
2025
4,19504,195
Total22,22415,4956,729

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Stove lifespan vs 10-yr crediting period unresolved

Leakage

Quantified but 5× discrepancy between documents (0.95% vs 5%)

Baseline

Project-specific; fuel-switch deviation observed in Luanda

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents