Masaka - Locally made cookstoves in Madagascar
#44of 91 in Cookstoves#5of 6 in Madagascar#506of 857 in Verra (VCS)
Audit Analysis
The Masaka cookstove project in Madagascar has a VVB-confirmed investment additionality test and a quantified 5% leakage deduction, but is hampered by a project-specific baseline, the absence of any monitoring or usage-verification data, and a validation report carrying 12 material findings including an internal inconsistency in GHG reduction estimates. The project is in its early crediting phase (started October 2023), so the lack of verified emissions data is expected, yet the volume of unresolved documentation gaps and corrective actions limits confidence in the claimed 372,652 tCO₂e lifetime figure.
Red Flags
- Material finding CAR 10 reports an inconsistency in estimated GHG emission reductions between Table 1 and Section 4.4 of the validation report, undermining confidence in the 372,652 tCO₂e lifetime claim.
- No buffer pool percentage is stated in any available document, leaving permanence risk for cookstove abandonment or fuel reversion unquantified.
- Nine corrective actions remain open, including missing benefit-permanence plan, missing end-user relocation monitoring, and missing site-inspection details, indicating the validation was not fully clean.
- No usage-monitoring method, verified usage rate, or end-use tracking is documented, making it impossible to confirm that distributed cookstoves are actually displacing fuelwood.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
No buffer pool stated; no reversal data yet
5% quantified deduction
Project-specific; no reassessment date
FPIC and grievance confirmed but 9 CARs open
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →