D.Light's Improved Cooking Project In Kenya
#4of 60 in Cookstoves#1of 42 in Kenya#86of 629 in Verra (VCS)#4of 38 in VMR0006
Audit Analysis
D.Light's cookstove project in Kenya is a VCS-registered avoidance project with VVB-confirmed additionality, a quantified 5% leakage deduction, and no material findings. However, the project relies on a project-specific baseline, the crediting period was shortened from the PDD's 21-year proposal to 7 years, and seven corrective action requests were raised during verification, indicating some monitoring compliance friction. The project delivered roughly 40% of the pro-rata expectation from the PDD's ex-ante estimate for the elapsed monitoring period, a gap partly explained by more conservative FNRB and leakage assumptions applied during monitoring.
Red Flags
- Crediting period in the 2025 verification report (7 years, 2022–2029) is less than one-third of the 21-year period stated in the PDD (2022–2043), indicating a major restructuring of the project design that is not clearly explained in the extracted record.
- Seven corrective action requests were raised and closed during the November 2025 verification, covering non-compliance with the monitoring plan, undocumented modifications, and calculation errors — a volume that signals recurring monitoring-quality issues.
- The FNRB value dropped from 0.9351 (local field, PDD) to 0.7875 (national default, monitoring/verification), a 16% reduction that materially lowers credit output and suggests the original PDD baseline may have been optimistic.
- The project delivered approximately 40% of the pro-rata expectation derived from the PDD's lifetime estimate for the 15.5-month monitoring period, even after adjusting for the lower FNRB and the 5% leakage deduction.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 964 | 771 | 193 | |
| 2023 | 68,645 | 39,916 | 28,729 | |
| 2024 | 105,266 | 80,693 | 24,573 | |
| Total | 174,875 | 121,380 | 53,495 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
5% quantified deduction
Project-specific, not yet due for reassessment
FPIC and grievance confirmed in 2025 VR but absent in 2024 V
Not CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →