CHITETEZO MBAULA PROJECT – MALAWI
#18of 92 in Malawi#250of 1339 in Verra (VCS)#20of 103 in VMR0006
Audit Analysis
The Chitetezo Mbula cookstove project in Malawi has a VVB-verified investment additionality test and a 5% leakage deduction, but suffers from a project-specific baseline with no stated reassessment date, a leakage justification gap in the most recent verification report, and a significant discrepancy between the lifetime ex-ante estimate (1,066,507 tCO₂e) and the verified monitoring-period figure (43,550 tCO₂e), which delivered only ~19% of the pro-rata expectation. Four inter-document contradictions and a medium extraction confidence further temper confidence in the data record.
Red Flags
- The lifetime ex-ante estimate of 1,066,507 tCO₂e (PDD, 2023-03-27) implies a pro-rata expectation of roughly 235,000 tCO₂e for the 18.5-month monitoring period, yet only 43,550 tCO₂e was verified — a delivery rate of approximately 19% of expectation, raising questions about the original PDD assumptions.
- The most recent verification report (2024-10-21) records the leakage justification as 'not addressed,' while an earlier verification report (2024-09-30) described it as 'quantified'; the 5% deduction is applied but its methodological basis is not clearly documented in the latest record.
- 26 Corrective Action Requests were raised during verification, including a stove-ID matching discrepancy and a clarification on stove lifespan and efficiency degradation monitoring, indicating operational data-quality issues that were resolved but warrant ongoing attention.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 3,854 | 2,849 | 1,005 | |
| 2022 | 34,364 | 14,820 | 19,544 | |
| 2023 | 5,332 | 0 | 5,332 | |
| Total | 43,550 | 17,669 | 25,881 |
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversal risk
5% deduction applied; justification gap in latest report
Project-specific; no reassessment date stated
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →