Global Cookstove Program (Phase 25)
#43of 60 in Cookstoves#311of 387 in India#496of 629 in Verra (VCS)#29of 38 in VMR0006
Audit Analysis
The Global Cookstove Program (Phase 25) is a VCS-registered cookstove project in India with VVB-confirmed additionality and a quantified 5% leakage deduction, but it suffers from a project-specific baseline, no buffer pool, no monitoring data yet available, and multiple corrective actions raised during validation. The low extraction confidence and absence of any verification report limit the ability to assess real-world performance.
Red Flags
- Four corrective actions (CARs) were required during validation, including unsupported biomass consumption values and an outdated fNRB calculation tool version
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified
- No monitoring report or verified ERR figure is available, making it impossible to assess actual delivery against the 48,690 tCO₂e lifetime claim
- Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable or incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
No buffer pool stated; 'N/A' for non-permanence
5% quantified deduction with justification
Project-specific; no reassessment date stated
Grievance mechanism and benefit-sharing present; FPIC not st
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →