Skip to main content
VCSEnergy demandPhilippines Registry: RegisteredVMR0006

Changing Lives via Improved Cooking Initiatives – Philippines

VCS-3356 ↗

#17of 60 in Cookstoves#1of 7 in Philippines#200of 629 in Verra (VCS)#12of 38 in VMR0006

5.8/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
4.0
Documentation
7.0

Audit Analysis

A VCS cookstove project in the Philippines with VVB-confirmed additionality, a quantified 5% leakage deduction, and no permanence risk (non-AFOLU). However, the project delivered only about 7% of its pro-rata PDD expectation in the first monitoring period, and several contradictions between the PDD and verification report (FPIC status, additionality test type, benefit sharing) reduce confidence in the project's documentation consistency.

Red Flags

  • The PDD lifetime estimate of 25,444,563 tCO2e implies a pro-rata expectation of roughly 6.97 million tCO2e for the first 23 months, yet only 488,799 tCO2e were verified — a delivery rate of approximately 7% of expectation, indicating a major overestimation in the original project design.
  • The verification report lists 12 material findings, including a discrepancy in job-creation figures between the monitoring report and project declarations, and a clarification needed on the sampling frame and stratified random approach.
  • FPIC status is contradictory: the PDD (June 2023) records it as not conducted, while the verification report (April 2025) records it as conducted. The more recent verification report is privileged, but the inconsistency raises questions about the robustness of the free, prior, and informed consent process.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2023
53,802053,802
2024
434,99713,031421,966
Total488,79913,031475,768

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Non-AFOLU, no reversal risk

Leakage

5% quantified deduction

Baseline

Project-specific baseline

Safeguards

FPIC and grievance present but FPIC status contradicted acro

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents