Distribution of Improved Cook Stoves in Sub-Saharan Africa-Zambia-CPA-007
#23of 60 in Cookstoves#3of 7 in Zambia#280of 629 in Verra (VCS)#16of 38 in VMR0006
Audit Analysis
A VCS cookstove project in Zambia with VVB-verified additionality and a quantified 5% leakage deduction, but undermined by a major usage-rate contradiction between the PDD and validation report, an exact match between claimed and verified ERR that raises over-crediting suspicion, and the absence of a stated buffer pool or baseline reassessment date. The project is functional but carries moderate data-reliability and over-crediting risk.
Red Flags
- Usage rate of 0.9 in the validation report contradicts 0.0418 in the PDD — a 21-fold discrepancy that materially affects the carbon claim
- Total ERR claimed and verified are identical at 1,598,600 tCO₂e, suggesting the verified figure may have been copied rather than independently measured
- If 1,598,600 is the 10-year lifetime estimate, the 2-year monitoring period delivered 500% of the pro-rata expectation, which is implausibly high and warrants scrutiny
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 640,601 | 0 | 640,601 | |
| 2022 | 705,780 | 0 | 705,780 | |
| Total | 1,346,381 | 0 | 1,346,381 |
Risk Indicators
VVB-confirmed combined test
No buffer pool stated; non-AFLOU limits reversal risk
5% quantified deduction
Project-specific; reassessment date not stated
Grievance and benefit-sharing present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →