Skip to main content
VCSEnergy demandZambia Registry: RegisteredVMR0006

Distribution of Improved Cook Stoves in Sub-Saharan Africa-Zambia-CPA-007

VCS-2713 ↗

#23of 60 in Cookstoves#3of 7 in Zambia#280of 629 in Verra (VCS)#16of 38 in VMR0006

5.5/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
4.0
Documentation
6.0

Audit Analysis

A VCS cookstove project in Zambia with VVB-verified additionality and a quantified 5% leakage deduction, but undermined by a major usage-rate contradiction between the PDD and validation report, an exact match between claimed and verified ERR that raises over-crediting suspicion, and the absence of a stated buffer pool or baseline reassessment date. The project is functional but carries moderate data-reliability and over-crediting risk.

Red Flags

  • Usage rate of 0.9 in the validation report contradicts 0.0418 in the PDD — a 21-fold discrepancy that materially affects the carbon claim
  • Total ERR claimed and verified are identical at 1,598,600 tCO₂e, suggesting the verified figure may have been copied rather than independently measured
  • If 1,598,600 is the 10-year lifetime estimate, the 2-year monitoring period delivered 500% of the pro-rata expectation, which is implausibly high and warrants scrutiny
  • No buffer pool percentage is stated in any available document, leaving permanence risk unquantified

Credit Vintages

IssuedRetiredAvailable
2021
640,6010640,601
2022
705,7800705,780
Total1,346,38101,346,381

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; non-AFLOU limits reversal risk

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment date not stated

Safeguards

Grievance and benefit-sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents