Skip to main content
VCSEnergy demandMalawi Registry: RegisteredVMR0006

Installation of high efficiency wood burning cookstoves in Malawi – Project 3

VCS-2886 ↗

#77of 150 in Cookstoves#50of 92 in Malawi#794of 1339 in Verra (VCS)#56of 103 in VMR0006

4.9/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
3.5
Documentation
5.5

Audit Analysis

A VCS cookstove project in Malawi with a verified combined additionality test and no reversal events, but undermined by a material finding of 9,490 excess VCUs issued, a project-specific baseline, an unaddressed buffer pool, and five cross-document contradictions on key parameters. The corrective cancellation mitigates the over-crediting event, but the pattern of inconsistencies across the verification and monitoring reports raises reliability concerns.

Red Flags

  • Material finding in the verification report: 9,490 VCUs were issued in excess of the correct amount; proponent compensated via cancellation, but the process failure is a significant integrity concern.
  • Five contradictions across documents on ERR figures, additionality test type, leakage justification, and FNRB method, indicating inconsistent reporting between the PDD, monitoring reports, and verification report.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2022
45,55112,35633,195
2023
28,009028,009
Total73,56012,35661,204

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

mixed evidence / unresolved risk

Leakage

5% deducted, justification inconsistent

Baseline

Project-specific, not yet due for reassessment

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents