Skip to main content
VCSEnergy demandNepal Registry: RegisteredVMR0006

SMG - Nepal Cookstove Program in Terai Region of Himalayas

VCS-3963 ↗

#68of 150 in Cookstoves#58of 101 in Nepal#738of 1339 in Verra (VCS)#49of 103 in VMR0006

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A registered VCS cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline, 14 corrective action requests during verification, and the absence of a stated buffer pool. The project delivered approximately 95% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating reasonable but not exceptional performance.

Red Flags

  • 14 Corrective Action Requests raised during verification, including inconsistent emission reduction data, non-transparent ER calculations, and gaps in the verification report itself
  • Baseline is project-specific rather than jurisdictional, and the last reassessment date is not stated in any document
  • Leakage deduction inconsistent across documents: 0% in the PDD versus 5% in the monitoring report, with the validation report stating leakage was 'not addressed'

Credit Vintages

IssuedRetiredAvailable
2024
7,00007,000
Total7,00007,000

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, reassessment date not stated

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents