Vai al contenuto principale
VCS Energy demand India Registry: Registered Documentazione completa General Methodology v2.0

Improved Cookstoves for Communities

VCS-2922 ↗

6.7 / 10
Integrity
6.6
Transparency
6.8
Claim Safety
6.1
Documentation
7.6

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was tested via an investment test and confirmed by the VVB (VKU Certifications).

missing Leakage handling is inconsistent across documents and the leakage deduction value is not found in the extracted record, weakening confidence in net ERs.

Transparency

verified Monitoring approach is stated (annual survey) and a specific monitoring period is provided (2023-01-01 to 2024-05-31) in the monitoring report (2024).

missing Key reconciliation items are missing in the extracted record (claimed ERs and verified usage rate), limiting independent checks against the verified 66,258 tCO2e.

Claim Safety

verified The project uses a local field-based fNRB approach with a high reported value (91.19), which is at least method-specified rather than defaulted.

missing CORSIA and CCP status are not stated in the extracted record, and leakage quantification is not consistently evidenced, increasing greenwashing/over-crediting risk.

Documentation

verified Multiple document types are present (PDD, validation report, monitoring report, issuance) with high extraction confidence and 16 documents used.

missing Some critical quantitative fields are still not found in the extracted record (e.g., leakage deduction %, usage rate assumed/verified), indicating completeness gaps.

Detailed Analysis

Integrity

Additionality appears reasonably supported: the project applies an investment test and additionality is confirmed by the VVB (VKU Certifications) as reflected in the extracted record from the validation/verification documentation. The baseline is project-specific (VMR0006), and the timing of any baseline reassessment is not stated in available documents, which is a moderate robustness gap. Leakage is a key weakness: the monitoring report (2024) characterizes leakage as quantified, but the validation report (2023) indicates it was not addressed, and no leakage deduction percentage is found in the extracted record.

Transparency

The monitoring report (2024-10-16) clearly states the monitoring period (2023-01-01 to 2024-05-31) and the usage monitoring method (annual survey), which supports basic MRV transparency. The verified ER figure is available (66,258 tCO2e), but the claimed ER figure is not found in the extracted record, reducing traceability of the verification outcome. In addition, the verified usage rate is not found in the extracted record, limiting the ability to assess whether survey results support the credited reductions.

Claim Safety

Over-crediting risk is moderated by the fact that fNRB is derived from local field methods and a specific value is reported (91.19), as reflected in the extracted record. However, the absence of a stated verified usage rate and the missing leakage deduction percentage make it difficult to judge whether credited reductions are conservatively netted. CORSIA eligibility and CCP status are not stated in available documents, so downstream claim constraints and double-claim signaling cannot be confidently assessed.

Documentation

Documentation coverage is relatively strong: the extracted record indicates 16 documents used with high extraction confidence, including a PDD, validation report, monitoring report, and issuance record. The monitoring report is recent (dated 2024-10-16) and aligns with an active crediting period (2021-11-20 to 2028-11-19). Nonetheless, several critical quantitative fields are not found in the extracted record (claimed ERs, leakage deduction %, usage rate assumed/verified), indicating that key decision-useful details are either missing or not captured clearly.

Overall

Overall quality is moderate: additionality is VVB-confirmed and safeguards elements (FPIC, grievance mechanism, benefit sharing) are documented, supporting credibility. The main reliability issue is a direct contradiction on leakage treatment: the monitoring report (2024-10-16) says leakage was quantified, while the validation report (2023-11-02) says leakage was not addressed; I privilege the more recent monitoring report for current-period practice, but the inconsistency itself reduces confidence and lowers integrity and claim-safety scores. With CORSIA/CCP status not stated and key quantitative MRV parameters not found in the extracted record, the project carries a non-trivial risk of overstated or hard-to-substantiate claims.

Audit Analysis

This VCS cookstove project shows moderately strong additionality support (investment test confirmed by the VVB) and has documented social safeguards elements (FPIC and a grievance mechanism). However, leakage treatment is inconsistent across documents and key quantitative parameters (notably leakage deduction and verified usage rate) are not clearly evidenced in the extracted record, increasing over-crediting risk.

Project Description

Proponent: Outreach Projects Pvt. Ltd. Protocol categories: Energy demand Protocols: VMR0006 Estimated annual GHG reductions: 449956 tCO2e Region: Registration date: 2024-01-10

Red Flags

  • Leakage is described as “quantified” in the monitoring report (2024) but was “not addressed” in the validation report (2023), raising reliability concerns about leakage treatment.
  • No leakage deduction percentage is found in the extracted record despite leakage being described as quantified.
  • Verified stove usage rate is not found in the extracted record, even though monitoring relies on annual surveys.

Credit Vintages

Issued Retired Available
2021
1,200 719 481
2022
1,435 435 1,000
Total 2,635 1,154 1,481

Cosa migliorerebbe questo punteggio

  • Disclose and clearly report the leakage deduction percentage and the underlying leakage quantification in the monitoring/verification package, and reconcile it with the validation report’s earlier treatment.
  • Publish verified stove usage metrics (e.g., usage rate, stacking/displacement evidence) and provide a clear claimed-vs-verified ER reconciliation table for the monitoring period.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

Non-reversal project type; no reversals reported

Leakage

Leakage treatment inconsistent; deduction not evidenced

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti