Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AMS-I-E-GRID-EF
AMS-I.E — Switch from non-renewable biomass for thermal applications by the user
About this methodology
Projects introduce renewable energy technologies for cooking or other heating needs in place of non-renewable biomass. The method measures the resulting emission reductions.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 14.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Cooking and heat
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Gold Standard (GS) (95 projects)
- Verra (VCS) (41 projects)
- Universal Carbon Registry (UCR) (7 projects)
1 more
- Global Carbon Council (GCC) (2 projects)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Fraction of non-renewable biomass (fNRB): the methodology sets rules for it (AMS-I.E v14, p. 9). CarbonMeld reads it in the project's documents. CM-F-AMS-I-E-FNRB
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
No usage monitoring (cookstoves, biogas, water treatment) Q-NO-USAGE-MONITORING
Cookstoves, biogas and water treatment: the monitoring or verification reports that CarbonMeld read give no usage rate. For biogas and water treatment, the rule applies where the methodology asks for a usage survey or an operation survey. Where CarbonMeld read no monitoring or verification report, the rule does not apply. A usage check by the verifier counts as usage monitoring. Operation logs and the share of units still in operation count too. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Figures set against the methodology's own values
fNRB above the official value, or an older default Q-FNRB-ABOVE
CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.
Above the official national value plus its 30% uncertainty.
Deductions that can apply
fNRB above the official value, or an older default Q-FNRB-OLD-DEFAULT
CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.
An older default value. This includes the TOOL33 values before version 03.0, the older national defaults and MoFuSS values whose stated year is before 2024. It also includes any other value that the documents give as a default. The CDM's fixed default of 0.3 is the exception. Only the two «above» cases can apply to it.
No additionality test in the documents (renewable energy) A-TEST-NOT-STATED
Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (AMS-I.E v14, p. 13). Our current method does not assess it. CM-F-AMS-I-E-LEAKAGE
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases (AMS-I.E v14 project emissions, p. 13). Our current method does not assess it. CM-F-AMS-I-E-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-I-E-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
All 15 versions · current v14.0
-
v14.0adopted 12 Jun 2025currentsource
EB125, Annex 4 Revision to remove reference to TOOL30 and to allow stakeholders to use fNRB values as presented in TOOL33.
-
v13.0adopted 8 Sept 2022source
Introduce reference to “TOOL33: Default values for common parameters”; Provides alternative procedures to determine the default values contained in TOOL33 Ensure the consistency in defintions of market penetration metrics and thresholds.
-
v12.0adopted 27 May 2021source
Allow the use of biogas flow meters to demonstrate operationality of the biogas system remotely.
-
v11.0adopted 14 Dec 2020source
Includes best practice examples for stove stacking.
-
v10.1adopted 5 Jun 2020source
Editorial revisions to correct cross-references throughout the document.
-
v10.0adopted 28 Nov 2019source
Introduce regional default fossil fuel emission factors and an alternative for the project participant to calculate the fossil fuel emission factor, as explained in CDM-MP80-A16; Clarify monitoring requirements; Incorporate the responses …
-
v09.0adopted 31 Aug 2018source
Include simplified provision for automatic additionality (if market penetration is less than or equal to 5 percent).
-
v08.0adopted 1 Nov 2017source
-
v07.0adopted 22 Jul 2016source
Include the default values for baseline fuel wood consumption per person; Include the procedures to quantify baseline woody biomass consumption for the entire household and; Introduce the monitoring table.
-
v06.0adopted 28 Nov 2014source
Introduces the “TOOL16: Project and leakage emissions from biomass”, streamlines biomass cultivation procedures across small and large scale methodologies; Removes restrictions for application in a PoA.
-
v05.0adopted 20 Jul 2012source
-
v04.0adopted 15 Apr 2011source
Requirements for leakage estimation simplified, default net gross adjustment factor is included as an option to account for any leakages, emission factor for the projected fossil fuel revised, more options for sampling and survey included.
-
v03.0adopted 17 Sept 2010source
To expand the applicability to renewable energy water treatment technologies.
-
v02.0adopted 26 Mar 2010source
To include the changes below which are consistent with the changes to AMS-II.G. approved by the Board at its fifty-first meeting: Further clarification on the eligible technology/measures; Default efficiency factors for baseline …
-
v01.0adopted 1 Feb 2008source
Initial adoption.
Top projects using AMS-I.E
This page ranks projects using AMS-I.E by their CarbonMeld document-based ratings. The rank compares project ratings; it is not a rating of the methodology itself.
20 rated projects of the 186 tracked in this methodology · average rating 4.4/10 · ranked by CarbonMeld's document-based rating: additionality, quantification, permanence (where carbon is stored) and claim safety.
107 analysed project pages, A–Z →
Which registries list projects under AMS-I.E?
In CarbonMeld's data, AMS-I.E projects are on 5 registries: Gold Standard (95), CDM (41) and Verra (41), and 2 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Gold Standard (GS) | 95 | 77 | See the list |
| CDM (UNFCCC) | 41 | 32 | See the list |
| Verra (VCS) | 41 | 24 | See the list |
| Universal Carbon Registry (UCR) | 7 | 4 | See the list |
| Global Carbon Council (GCC) | 2 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis, so they can be larger than the ranking below. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- 4 4.7
- 5 4.7
- 6 4.7
- 7 4.6
- 8 4.5
- 9 4.5
- 10 4.5
- 11 4.5
- 12 4.5
- 13 4.5
- 14 4.5
- 15 4.4
- 16 4.4
- 17 4.2
- 18 4.2
- 19 3.7
- 20 3.3
