Nairobi River Basin Biogas Project
Score Breakdown
Integrity
verified The verification report confirms additionality through a barrier test, and the VVB is named as Earthood Services Private Limited.
missing The verification material lists many findings and corrective actions, including multiple CLs, CARs, and an FAR, which lowers confidence in the robustness of the project controls.
Transparency
verified The monitoring period for 2022 and the verifier identity are stated, and the report provides claimed versus verified emission reductions of 7,437 versus 7,222.
missing Buffer pool coverage, reversal handling, and the leakage deduction percentage are not stated in the extracted record, limiting MRV transparency.
Claim Safety
verified The project uses a quantified leakage justification, which is better than an unaddressed leakage claim.
missing The baseline is project-specific rather than a recently reassessed standardized baseline, and the claimed reductions exceed the verified amount, indicating some over-claim risk.
Documentation
verified The record draws on many documents, with 23 documents used and a named verifier, which supports basic documentation depth.
missing The extraction confidence is only medium, and the record contains several unresolved or poorly specified items, including missing buffer pool and reversal details.
Detailed Analysis
Integrity
The project has a positive additionality signal because the verification report confirms a barrier test, and the VVB is identified as Earthood Services Private Limited. Leakage is at least addressed in principle through a quantified justification, but the leakage deduction percentage is not stated, and reversal events are marked as not addressed, which weakens permanence confidence. The long list of material findings and corrective actions in the verification material suggests the project required substantial cleanup before acceptance.
Transparency
Transparency is moderate because the monitoring period for 2022 is stated and the report provides both claimed and verified emission reductions, 7,437 versus 7,222. However, key MRV details are missing from the extracted record, including buffer pool coverage, reversal treatment, and verified usage rates. The usage monitoring method is described as self-report in the latest record, while an earlier document referenced an annual survey, which adds some uncertainty about consistency.
Claim Safety
Claim safety is weakened by the project-specific baseline approach and the lack of a recent baseline reassessment. The verified reductions are lower than the claimed amount, which is a modest over-claim signal, though not extreme. The project also relies on a national default for non-renewable biomass, but the extracted record does not provide enough detail to judge whether that assumption is conservative relative to local conditions.
Documentation
Documentation depth is fair because 23 documents were used and the verifier is named, but the extraction confidence is only medium, so at least one key source was not fully readable. The record also shows many corrective actions and several items that remain not fully specified, including buffer pool coverage and reversal handling. The crediting period and monitoring period are both available, but the documentation still appears incomplete for a high-confidence assessment.
Overall
I privileged the more recent 2024 values where contradictions existed, such as the latest grievance-mechanism, leakage, safeguards, FNRB, and usage-monitoring entries, because they appear to reflect the most current project record. That said, the contradictions themselves reduce reliability: earlier documents indicate different positions on FPIC, benefit sharing, additionality framing, leakage treatment, and the crediting period, so the score is adjusted downward for consistency risk. The project is not obviously weak enough to trigger the integrity gate, but the documentation and safeguard gaps keep the overall assessment in the middle range.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality and a quantified leakage treatment, but the evidence base is weakened by many corrective actions and several unresolved safeguard and permanence gaps. Transparency is only moderate because the monitoring period and verifier are known, yet key items such as buffer coverage, reversal handling, and some usage data are missing or inconsistent. Overall, this looks like a mid-quality biogas project with meaningful documentation and reliability concerns.
Project Description
Developer: atmosfair gGmbH Type: Biogas - Heat Size: Small Scale Methodology: AMS-I.E. Switch from Non-Renewable Biomass for Thermal Applications by the User Crediting period: 2012-12-31 → 2022-12-30 Estimated annual credits: 35949 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 17: Partnerships for the Goals, Goal 8: Decent Work and Economic Growth, Goal 3: Good Health and Well-Being, Goal 13: Climate Action
Red Flags
- A long list of material findings and corrective actions suggests the verification process identified multiple issues that needed fixing.
- Safeguards are weakly documented: FPIC is not found in the extracted record, and the latest documents say safeguards were not mentioned.
- Permanence and leakage are not fully robustly evidenced because reversal events are not addressed and the leakage deduction percentage is not stated.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 2 | 0 | 2 | |
| 2013 | 1,026 | 0 | 1,026 | |
| 2014 | 1,763 | 0 | 1,763 | |
| 2015 | 2,437 | 0 | 2,437 | |
| 2016 | 2,917 | 0 | 2,917 | |
| 2017 | 3,153 | 0 | 3,153 | |
| 2018 | 3,458 | 0 | 3,458 | |
| 2019 | 3,498 | 0 | 3,498 | |
| 2020 | 3,782 | 9 | 3,773 | |
| 2021 | 3,450 | 400 | 3,050 | |
| 2022 | 3,763 | 0 | 3,763 | |
| Total | 29,249 | 409 | 28,840 |
Cosa migliorerebbe questo punteggio
- Publish a complete, reconciled monitoring package that clearly states the leakage deduction, buffer treatment, reversal provisions, and verified usage data.
- Resolve the document contradictions by providing a version-controlled summary showing which safeguard, baseline, and crediting-period statements are authoritative and why.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed barrier test
reversal handling not addressed
quantified but deduction not stated
project baseline, reassessment missing
FPIC and safeguards not documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- GS4GG-Annual-Report_v2.0_2022_without_personal_data_31012023.pdf
- Monitoring Report_3rd monitoring period_31.12.2016 to 30.12.2018_v3.pdf
- Kenya_MP5_CER complete database calculation_public_04062024.xlsx
- Monitoring Report_2nd monitoring period_31.12.2014 to 30.12.2016_v4.pdf
- GS_MP4_monitoring_report_ver2_11102021.docx
- GS4GG-Annual-Report_2021-v1.1_without_personal_data_3101023.docx
- +6 more
Other
validation
- FVR_GS.VER.23.32-GS-939-DM.pdf
- GS_Nairobi_biogas_VCR_MP4_06012022.pdf
- GS_Nairobi_biogas_VCR_MP4_20221020(1).pdf
- Verification Report_3rd monitoring period_31.12.2016 to 30.12.2018_v3.pdf
- (1)Verification Report_2nd monitoring period_31.12.2014 to 30.12.2016_v3.pdf
- (1)Verification Report_1st monitoring period_12.31.2012 to 12.30.2014_v4.PDF
- +1 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →