Household biogas project in Uttarakhand and Kerala, India
GS-1107 ↗ · current registry ID: GS6411
#217of 1329 in Industrial#340of 975 in India#375of 1801 in Gold Standard (GS)#16of 60 in AMS-I.E
Audit Analysis
A household biogas project under Gold Standard with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a material finding that emission reductions were initially miscalculated across varying commissioning dates, eight corrective actions, and the absence of a stated buffer pool or reversal-risk treatment. The project delivered roughly 107% of its pro-rata ex-ante expectation for the monitoring period, indicating no material over-crediting after correction, but the project-specific baseline and unaddressed permanence risks limit confidence.
Red Flags
- Material finding: emission reductions were initially calculated for the full monitoring period despite staggered biogas plant commissioning dates, indicating an over-crediting error that required correction
- Eight corrective actions (CAR 01–CAR 08) were required, suggesting systemic calculation or reporting weaknesses in the initial verification
- No buffer pool percentage is stated in any available document, and reversal events are explicitly noted as 'not addressed', leaving permanence risk unquantified
- FPIC status is contradictory: the validation report confirms it was conducted, while the PDD states it was not
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 9,069 | 9,069 | 0 | |
| 2018 | 54,268 | 54,268 | 0 | |
| 2019 | 58,304 | 58,087 | 217 | |
| 2020 | 60,446 | 58,849 | 1,597 | |
| Total | 182,087 | 180,273 | 1,814 |
Risk Indicators
VVB-confirmed financial test
reversals not addressed
5% quantified deduction with justification
Project-specific; reassessment timing not stated
FPIC confirmed; grievance mechanism and benefit sharing present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →