Household Biogas plants installed in rural areas of Maharashtra
GS-1421 ↗ · current registry ID: GS2519
#49of 268 in Biogas#432of 975 in India#518of 1801 in Gold Standard (GS)#18of 60 in AMS-I.E
Audit Analysis
A Gold Standard household biogas project in rural Maharashtra with a VVB-verified investment additionality test, quantified 5% leakage deduction, and documented safeguards including FPIC and a grievance mechanism. However, the project-specific baseline, unaddressed reversal risk, absence of a buffer pool, and several cross-document contradictions (particularly on FNRB method and ERR figures across periods) limit confidence in the robustness of the credit claims. The project is at the end of its 10-year crediting period, and the lifetime ex-ante ERR estimate is not available in the extracted record, preventing a full pro-rata delivery check.
Red Flags
- Reversal risk for biogas plants is explicitly 'not addressed' in the verification report, and no buffer pool percentage is stated — a material permanence gap for a project where plant failure or abandonment would reverse emissions reductions.
- The FNRB method is reported as 'national_default' in the 2021 verification report but 'local_field' in the 2022 monitoring report, creating uncertainty about which basis was actually used for the final credit calculation.
- The lifetime ex-ante ERR estimate is not found in the extracted record, making it impossible to verify whether the 40,668 tCO2e claimed for the 2021–2022 monitoring period is consistent with the original project design.
- Multiple ERR figures across documents (40,668; 45,493; 48,551; 97,102) span different monitoring periods and cannot be reconciled into a single consistent trajectory without the PDD's ex-ante schedule.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 31,525 | 31,525 | 0 | |
| 2013 | 48,551 | 48,551 | 0 | |
| 2014 | 48,079 | 48,048 | 31 | |
| 2015 | 46,230 | 46,230 | 0 | |
| 2016 | 45,001 | 44,445 | 556 | |
| 2017 | 44,239 | 44,239 | 0 | |
| 2018 | 43,790 | 43,790 | 0 | |
| 2019 | 44,004 | 43,892 | 112 | |
| 2020 | 42,775 | 42,232 | 543 | |
| 2021 | 40,924 | 34,369 | 6,555 | |
| 2022 | 14,181 | 3,072 | 11,109 | |
| Total | 449,299 | 430,393 | 18,906 |
Risk Indicators
Investment test, VVB-verified
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, reassessment date not stated
FPIC, grievance, benefit-sharing documented
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →