Integrity

verified The verification report confirms additionality through a combined test and says the VVB accepted it.

missing The verification report shows a large gap between claimed and verified reductions, and reversal events are not addressed.

Transparency

verified The monitoring period is clearly stated for 2020-01-01 to 2021-12-31, and the project has a named VVB.

missing Verified usage rates, CORSIA eligibility, and CCP status are not stated in the extracted record, limiting registry transparency.

Claim Safety

verified The project uses a project baseline and applies a quantified leakage deduction of 5%, which supports some claim discipline.

missing The claimed 28,700 ERs versus 9,932 verified ERs suggests substantial over-claim risk, and the FNRB basis is disputed across documents.

Documentation

verified The record draws on many extracted facts and the verification report includes multiple corrective actions and closures.

missing One or more source documents were only moderately readable, and the record contains several contradictions across dates and values.

Detailed Analysis

Integrity

The verification report confirms additionality using a combined test, and the VVB accepted that assessment, which is a meaningful positive. The project also reports a quantified leakage deduction of 5% and a project baseline, but reversal events are not addressed and the buffer pool is not found in the extracted record. The very large difference between claimed and verified ERs raises concern about the robustness of the emissions accounting.

Transparency

The monitoring period is clearly stated, the VVB is named as 4K Earth Science Private Limited, and the report includes a list of corrective actions and closures. However, verified usage rates are not found in the extracted record, and CORSIA eligibility is not stated. CCP status is also only noted as not mentioned, so registry-level transparency remains limited.

Claim Safety

Claim safety is weakened by the gap between 28,700 claimed ERs and 9,932 verified ERs in the verification report. The project uses a project baseline and a 5% leakage deduction, which helps, but the FNRB basis is inconsistent across documents: the newer record privileges a national default over an older state-level value. Because usage monitoring is based on annual surveys and the verified usage rate is not stated, over-crediting risk remains material.

Documentation

The record includes a substantial number of extracted facts and the verification report is dated 2023-07-12, which is reasonably recent relative to the crediting period. Still, the extraction confidence is only medium, and the evidence set is incomplete because several key fields are not found in the extracted record. The repeated corrective-action entries suggest documentation exists, but the contradictions reduce confidence in completeness and consistency.

Overall

I privileged the newer verification report dated 2023-07-12 over older documents when contradictions appeared, because it is the most recent and project-specific source. That means I accepted the annual survey usage monitoring method, the national-default FNRB approach, the 5% leakage deduction, and the 2018-2024 crediting period from the newer record. Even so, the contradictions across documents, plus the large claimed-versus-verified ER gap, materially reduce reliability and keep the overall score in the mid range.

Audit Analysis

The project has some positive integrity signals, including VVB-confirmed additionality and a quantified leakage deduction, but the evidence is weakened by unresolved contradictions and a large gap between claimed and verified ERs. Transparency is only moderate because the monitoring approach is described, yet key items such as verified usage rates and registry eligibility status are not stated in the extracted record. Overall, this looks like a real project with documented safeguards, but the reliability of the emissions claim is limited by inconsistent source records and weak disclosure on several core MRV items.

Project Description

Developer: Social Education & Development Society (SEDS) Type: Biomass, or Liquid Biofuel - Heat Size: Small Scale Methodology: AMS-I.E. Switch from Non-Renewable Biomass for Thermal Applications by the User Crediting period: 2011-01-01 → 2017-12-31 Estimated annual credits: 15749 tCO2e SDGs: Goal 13: Climate Action, Goal 12: Responsible Production and Consumption, Goal 3: Good Health and Well-Being

Red Flags

  • Verified emissions reductions are far below the amount claimed, with 9,932 verified versus 28,700 claimed in the verification report.
  • The extracted record contains multiple contradictions on usage monitoring, FNRB, leakage deduction, safeguards, and crediting period, which reduces confidence in the reported figures.

Credit Vintages

Issued Retired Available
2011
447 0 447
2012
5,475 0 5,475
2013
7,304 0 7,304
2014
9,161 0 9,161
2015
11,876 0 11,876
2016
14,637 0 14,637
2017
11,975 0 11,975
2018
12,690 0 12,690
2019
11,413 0 11,413
2020
12,786 12,786 0
2021
10,819 8,051 2,768
Total 108,583 20,837 87,746

Cosa migliorerebbe questo punteggio

  • Provide a reconciled MRV table explaining the gap between claimed and verified ERs, with source-by-source resolution of all contradictions.
  • Disclose verified usage rates, CORSIA eligibility, CCP status, and a clear reversal/buffer treatment statement in the public documentation.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No reversal treatment stated

Leakage

5% quantified deduction

Baseline

Project baseline with reassessment timing unclear

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA eligibility not stated; CCP not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti