Biodigestor Program in the State of Kerala by INSEDA and SDA
GS-575 ↗ · current registry ID: GS3404
#9of 111 in Biogas#103of 387 in India#77of 426 in Gold Standard (GS)#4of 26 in AMS-I.E
Audit Analysis
A Gold Standard biogas project in Kerala with VVB-confirmed additionality and quantified leakage, but weakened by a project-specific baseline, absence of a stated buffer pool, and a high volume of corrective actions (17 CARs/CRs) that signal recurring data-quality issues. The project delivered roughly 57% of its claimed emissions reductions for the 2019–2021 monitoring period, which is conservative but suggests ex-ante estimates were optimistic. CORSIA eligibility introduces a dual-channel risk that is not fully mitigated in the available documentation.
Red Flags
- 17 corrective actions and comments (12 CARs, 5 CRs) were raised during verification, including an inconsistency in fire-wood consumption reporting between the emission reduction worksheet and the monitoring report, indicating recurring data-quality weaknesses.
- CORSIA eligibility is confirmed while CCP status is not mentioned, creating an unresolved dual-channel / double-claiming risk.
- The FNRB method is contradictory across documents: the verification report (2017) states a local field measurement while the monitoring report (2023) references a national default, undermining confidence in the emission factor applied.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified for a biogas project where digester failure or abandonment could reverse credits.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 10,266 | 10,266 | 0 | |
| 2014 | 15,170 | 15,170 | 0 | |
| 2015 | 15,139 | 15,139 | 0 | |
| 2016 | 15,190 | 15,190 | 0 | |
| 2017 | 15,159 | 15,159 | 0 | |
| 2018 | 11,450 | 11,450 | 0 | |
| 2019 | 12,556 | 7,094 | 5,462 | |
| 2020 | 13,969 | 13,690 | 279 | |
| 2021 | 3,435 | 739 | 2,696 | |
| Total | 112,334 | 103,897 | 8,437 |
Risk Indicators
VVB-confirmed investment test
No reversal events but no buffer pool stated
5% quantified deduction
Project-specific, no reassessment date stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA-eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →