Skip to main content

Leaderboards/methodology

Top AMS-II.D projects

17 rated projects in this methodology · average score 3.4/10 · ranked by CarbonMeld integrity, transparency and claim-safety scoring.

#1Fuel efficiency improvement in glass meltingCDMIndiaOther6.2/10#2Enhancing energy efficiency by replacing batch smelter by continuous smelter at Karaikal, PondicherryCDMIndiaIndustrial6.1/10#3Eficiencia energética por Control Operacional en la Refinería de CartagenaCCColombiaIndustrial5.6/10▲+0.7
  1. 45.4
  2. 55.1
  3. 65.1
  4. 74.4
  5. 84.4
  6. 94.2
  7. 104.2
  8. 114▼-0.2
  9. 123.5▼-0.3
  10. 13
  11. 14
  12. 15
  13. 16
  14. 17

Scores reflect registry documentation, monitoring history and marketplace behaviour. Read the methodology.