Boiler Second Economizer in Yansab, Kingdom of Saudi Arabia

CDM-10114 ↗

#734of 1459 in CDM (UNFCCC)#5of 12 in AMS-II.D

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

A CDM boiler economizer project in Saudi Arabia with VVB-confirmed additionality and inherently low permanence risk, but undermined by 14 material findings at validation, a project-specific baseline, and a monitoring-period ER figure that exceeds the ex-ante lifetime estimate by a factor of roughly four. The project is functional but carries elevated over-crediting risk and documentation-quality concerns.

Red Flags

  • Monitoring-period ERs (28,743 tCO2e, 2017–2019) exceed the ex-ante lifetime estimate (23,018 tCO2e, validation report 2016) by approximately 4.2× on a pro-rata basis, raising serious over-crediting concerns
  • 14 material findings (CARs) at validation covering baseline data, monitoring plan, PDD inconsistencies, and stakeholder-consultation timing, plus 1 unresolved FAR on calibration frequency
  • Project-specific baseline with no documented reassessment schedule; baseline data and boiler remaining-life documentation were flagged as insufficient (CAR#06, CAR#14)

Credit Vintages

IssuedRetiredAvailable
2022
35,827035,827
Total35,827035,827

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

EE supply-side, low reversal risk

Leakage

0% deemed negligible, reasonable for economizer

Baseline

Project-specific, reassessment timing not stated

Safeguards

Mentioned but no FPIC or grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-II.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents