Fuel efficiency improvement in glass melting
#126of 975 in India#154of 1459 in CDM (UNFCCC)#1of 12 in AMS-II.D
Audit Analysis
A CDM energy-efficiency project in Indian glass manufacturing with a VVB-confirmed barrier additionality test and a reputable verifier (DNV). The project-specific baseline and 0% leakage deduction are standard for this methodology but limit robustness, and two material findings (corrective actions) were raised and resolved during monitoring. Overall a moderately well-documented project with minor data gaps and one explainable inconsistency in reported emission figures.
Red Flags
- Leakage justification is inconsistent between the PDD (quantified) and the 2011 monitoring report (deemed negligible), creating ambiguity about whether leakage was actually calculated or simply assumed zero.
- Reported emission reduction figures differ substantially between the 2007 monitoring report (37,664 tCO2e) and the 2011 monitoring report (19,768 tCO2e); while likely attributable to the CAR that modified baseline calculations, the magnitude of the revision warrants scrutiny.
- Baseline is project-specific rather than jurisdictional, and no baseline reassessment date is recorded in the available documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 41,087 | 0 | 41,087 | |
| Total | 41,087 | 0 | 41,087 |
Risk Indicators
VVB-confirmed barrier test
Energy-efficiency, no reversal risk
0% deduction, minor doc inconsistency
Project-specific, no reassessment date
Mentioned but details not extracted
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →