GHG emission reductions through pre-heat train optimization in the CDU and VDU of Digboi Refinery,, Indian Oil Corporation Limited (Assam Oil Division)
#222of 975 in India#278of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM energy-efficiency project at the Digboi Refinery with a solid additionality assessment (combined test confirmed by DNV) and a measured project-specific baseline. The most significant concern is a large discrepancy between the ex-ante emission-reduction estimate (2,693 tCO2e over the full crediting period) and the verified figure for the first two-year monitoring period (4,871 tCO2e), which is roughly nine times the pro-rata expectation. Safeguards documentation is thin, with no grievance mechanism or free, prior, and informed consent process recorded.
Red Flags
- Verified ERR of 4,871 tCO2e for the first ~2-year monitoring period is approximately 904% of the pro-rata ex-ante expectation (~539 tCO2e), raising questions about either the conservatism of the original estimate or the robustness of the monitoring calculation
- Crediting-period start date differs between the validation report (2008-05-01) and the monitoring report (2008-12-04), creating ambiguity about the exact project timeline
- No grievance mechanism, free prior and informed consent, or stakeholder-engagement details are documented in the available record
- No functional-newness / reference-baseline (FN-RB) methodology or usage-monitoring method is stated in the extracted data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 4,871 | 0 | 4,871 | |
| Total | 4,871 | 0 | 4,871 |
Risk Indicators
Combined test, VVB-confirmed (DNV)
EE project, no inherent reversal risk
Deemed negligible, reasonable for in-facility EE
Project-specific, measured, not jurisdictional
Mentioned but no grievance mechanism or FPIC documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →