Skip to main content
CCManufacturing industryColombiaAMS-II.D

Eficiencia energética por Control Operacional en la Refinería de Cartagena

ECO-113 ↗

#166of 1329 in Industrial#18of 124 in Colombia#18of 99 in CerCarbono (CC)#3of 12 in AMS-II.D

5.6/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
6.0

Audit Analysis

An energy-efficiency project at the Cartagena Refinery verified under the Colombian CerCarbono registry using AMS-II.D methodology. The VVB confirmed additionality via a combined test and the project delivered 131% of the pro-rata ex-ante expectation for the elapsed monitoring period, but significant MRV errors (a 21.92% baseline underestimation and inclusion of non-eligible combustion-efficiency improvements) were identified and corrected during verification. Safeguards documentation is weak, with no FPIC, no grievance mechanism per the verification report, and permanence/reversal risk left unaddressed.

Red Flags

  • Material finding: 21.92% underestimation of emission reductions for Unit U-044 due to a reference error in the 2021 baseline, corrected in the monitoring report
  • Material finding: combustion-efficiency improvements were incorrectly included in emission reduction calculations, which is not acceptable under AMS-II.D; corrected to exclude non-eligible activities
  • Permanence and reversal risk explicitly not addressed (Section 5.2.3 states it does not apply to the PMCC) and no buffer pool is documented
  • Grid emission factor contradiction within the same monitoring report: 0.3316 vs 0.0582 tCO2/kWh, a factor-of-5.7 discrepancy
  • No FPIC conducted and no grievance mechanism per the verification report, despite the PDD claiming otherwise

Credit Vintages

IssuedRetiredAvailable
2020
34,206034,206
2021
61,905061,905
Total96,111096,111

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Not addressed

Leakage

0% deduction, quantified justification

Baseline

Project-specific, modeled, no reassessment date

Safeguards

No FPIC, no grievance mechanism per VVB

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-II.D: Energy efficiency and fuel switching in industrial facilities

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents