Energy Efficiency Improvement in Electric Arc Furnace at Indian Seamless Metal Tube Limited (ISMT), Jejuri, Maharashtra
#60of 1329 in Industrial#190of 975 in India#229of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM energy-efficiency project at an Indian steel plant with VVB-confirmed additionality and a standardized AMS methodology, but weakened by a project-specific baseline, a thin 'deemed negligible' leakage justification, and a validation phase that required 15 corrective and non-material observations. The monitoring report shows the project delivered roughly 73% of its pro-rata expected reductions for the elapsed period, which is acceptable but not strong.
Red Flags
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis in the monitoring report
- Fifteen CARs and NIRs were raised during validation, including missing baseline condition, unclear project boundary, and unsupported technological barriers — indicating weak initial documentation
- Grid emission factor is from 2005 and no updated factor or reassessment is documented for the monitoring period
- One of the six evidence documents is of unknown type, reducing confidence in the completeness of the record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 7,348 | 0 | 7,348 | |
| Total | 7,348 | 0 | 7,348 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific, no reassessment data
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →