Skip to main content
CDMEE own generationIndiaAMS-II.D

Energy Efficiency measure at Grasim, Kotputli.

CDM-3602 ↗

#956of 1329 in Industrial#799of 975 in India#1199of 1459 in CDM (UNFCCC)#8of 12 in AMS-II.D

4.4/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A CDM energy-efficiency project at Grasim, Kotputli with a VVB-confirmed investment additionality test and a project-specific baseline. The record is heavily constrained by the absence of any monitoring or verification data, a low extraction confidence rating, and a crediting-period contradiction between the PDD and the validation report, leaving the claimed 215,090 tCO₂e unverified against actual performance.

Red Flags

  • Crediting period contradicts between the PDD (2010-05-01 to 2020-05-01) and the validation report (2009-07-01 to 2019-06-30); the validation report is privileged as the more recent and authoritative VVB document, but the discrepancy undermines data reliability.
  • No monitoring reports, verified ERR, or FNRB data are present in the extracted record, so the 215,090 tCO₂e lifetime claim cannot be cross-checked against actual performance.
  • Nine Corrective Action Requests and ten Clarification Requests were raised during validation (all closed), indicating significant documentation or methodological issues at the validation stage.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing confidence in the extracted facts.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

EE project, no reversal risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, no reassessment data

Safeguards

Mentioned, benefit sharing noted, no FPIC/grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS II D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents