Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AM0046 — Distribution of efficient light bulbs to households

About this methodology

Projects distribute efficient lamps to households and replace functioning, less efficient lamps. The method measures electricity savings and the associated reduction in power-generation emissions.

Version
3.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Buildings and appliances
Official page
cdm.unfccc.int ·
Also used by projects of

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it (AM0046 v03.0 emission reductions, p. 9). CarbonMeld reads it in the project's documents. CM-F-AM0046-GRID-EF

    Link
  • shown

    Leakage: the methodology sets rules for it (AM0046 v03.0 Leakage para 70, p. 26). CarbonMeld reads it in the project's documents. CM-F-AM0046-LEAKAGE

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Usage rate of the devices: the methodology sets rules for it (AM0046 v03.0 monitoring with control groups, p. 9). Our current method does not assess it. CM-F-AM0046-USAGE

    Link
  • not assessed

    No legal requirement for the activity: the methodology sets rules for it (AM0046 project lamps must exceed MEPS, p. 4). Our current method does not assess it. CM-F-AM0046-REGULATORY-SURPLUS

    Link
  • not assessed

    Tracking of the end use: the methodology sets rules for it (AM0046 v03.0 return of baseline lamps, p. 5). Our current method does not assess it. CM-F-AM0046-END-USE-TRACKING

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0046-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v03.0adopted 28 Nov 2023source

    Remove references to CFL and LED lamps to make the methodology technologically neutral.

  • v02.0adopted 19 Oct 2007 – 27 Nov 2023source

    Incorporate the use of the “Tool to calculate emission factor for an electricity system”.

  • v01.0adopted 16 Feb 2007 – 1 Nov 2007source

    Initial adoption.

Projects using AM0046

Browse 5 published projects using AM0046, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AM0046?

In CarbonMeld's data, AM0046 projects are on 2 registries: CDM (4) and Verra (1). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)41See the list
Verra (VCS)10See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database