Grid emission factor: the methodology sets rules for it in some cases (v1.1 §2.2, p. 6). CarbonMeld reads it in the project's documents. CM-F-GS-MMECD-GRID-EF
GS-MMECD — Metered & measured energy cooking devices (MECD)
About this methodology
Projects introduce cooking technologies for households, communities or institutions that reduce or avoid emissions. The methodology quantifies the reductions from metered energy use or comprehensive records of fuel sales.
- Issued by
- Gold Standard (GS) · issuer's site
- Version
- 2.0 · source ·
- Climate outcome
- Emission reductions
- Activity
- Cooking
- ICVCM Core Carbon Principles
- Approved by the ICVCM for Gold Standard, version(s) 1.0-1.2 (source) ·
- Official page
- globalgoals.goldstandard.org ·
Approval applies to the programs and versions listed. The official decision and project-specific conditions must also be met for credits to carry a CCP label; this is not a label for the projects on this page.
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Fraction of non-renewable biomass (fNRB): the methodology sets rules for it in some cases (v1.1 §3.5.5, p. 11). CarbonMeld reads it in the project's documents. CM-F-GS-MMECD-FNRB
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
No usage monitoring (cookstoves, biogas, water treatment) Q-NO-USAGE-MONITORING
Cookstoves, biogas and water treatment: the monitoring or verification reports that CarbonMeld read give no usage rate. For biogas and water treatment, the rule applies where the methodology asks for a usage survey or an operation survey. Where CarbonMeld read no monitoring or verification report, the rule does not apply. A usage check by the verifier counts as usage monitoring. Operation logs and the share of units still in operation count too. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Figures set against the methodology's own values
fNRB above the official value, or an older default Q-FNRB-ABOVE
CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.
Above the official national value plus its 30% uncertainty.
Deductions that can apply
fNRB above the official value, or an older default Q-FNRB-OLD-DEFAULT
CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.
An older default value. This includes the TOOL33 values before version 03.0, the older national defaults and MoFuSS values whose stated year is before 2024. It also includes any other value that the documents give as a default. The CDM's fixed default of 0.3 is the exception. Only the two «above» cases can apply to it.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (v1.1 §3.7, p. 14). Our current method does not assess it. CM-F-GS-MMECD-LEAKAGE
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases. Our current method does not assess it. CM-F-GS-MMECD-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-GS-MMECD-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Projects using GS-MMECD
Browse 41 published projects using GS-MMECD, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under GS-MMECD?
In CarbonMeld's data, GS-MMECD projects are on one registry: Gold Standard (41 projects, 24 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Gold Standard (GS) | 41 | 24 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
3 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages show the analysis.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Rated
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- PoA GS11815- Electric Cooking Program by ATEC - Electric Cooking Program in Bangladesh by ATEC-VPA02Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
