Beyond Biomass: UpEnergy Electric Cooking-VPA 1
GS-3674 ↗ · current registry ID: GS11579
#55of 202 in Industrial#6of 23 in Uganda#160of 426 in Gold Standard (GS)
Audit Analysis
The UpEnergy electric cooking project in Uganda has a VVB-confirmed additionality assessment and a quantified 5% leakage deduction, but suffers from a striking discrepancy between the monitoring report's claimed ERR (143,455) and the verification report's verified figure (637), a project-specific baseline with no stated reassessment date, and no buffer pool or reversal-risk treatment. Multiple contradictions across documents on monitoring method, FNRB source, and crediting period further erode confidence in the data chain.
Red Flags
- The monitoring report (Sep 2024) reports a claimed ERR of 143,455 while the verification report (Feb 2025) verifies only 637 — a 225-fold gap that is unexplained in the available documents and raises serious questions about baseline assumptions or data integrity.
- No buffer pool percentage is stated and reversal events are explicitly 'not addressed,' leaving the 5-year crediting period exposed to cookstove replacement or abandonment risk with no financial backstop.
- The monitoring method is reported as 'smart meter' in the verification report but 'annual survey' in the monitoring report — a fundamental MRV inconsistency that undermines confidence in the verified usage rate of 100%.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 475 | 0 | 475 | |
| 2024 | 162 | 0 | 162 | |
| Total | 637 | 0 | 637 |
Risk Indicators
VVB-confirmed combined test
No buffer pool; reversal not addressed
5% quantified deduction
Project-specific; no reassessment date
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →