Beyond Biomass: UpEnergy Electric Cooking-VPA 9
GS-4265 ↗ · current registry ID: GS12082
#27of 202 in Industrial#3of 8 in Tanzania#95of 426 in Gold Standard (GS)
Audit Analysis
A Gold Standard VPA electric-cooking project in Tanzania with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a 100% verified usage rate, a 30% fNRB discrepancy between the verification and monitoring reports, and a crediting-period contradiction (5 vs 20 years) that raises material over-crediting and documentation-reliability concerns.
Red Flags
- Verified usage rate of 100% is extremely aggressive for household electric cooking devices and creates significant over-crediting risk
- fNRB value contradicts between the verification report (0.731) and the monitoring report (0.51), a 30% gap that materially affects credit quantities
- Crediting period stated as 5 years in the verification report but 20 years in the validation report, indicating a fundamental scope inconsistency
- CCP status is 'eligible', creating dual-channel (Gold Standard + CCP) double-claim risk
- 20+ corrective actions and multiple material findings across verification and validation reports indicate persistent documentation-quality issues
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 984 | 0 | 984 | |
| 2024 | 417 | 0 | 417 | |
| Total | 1,401 | 0 | 1,401 |
Risk Indicators
VVB-confirmed combined test
No buffer pool stated; no reversals but device-replacement r
5% quantified deduction with justification
Project-specific baseline; reassessment timing not stated
FPIC conducted; grievance mechanism present; SDG reporting t
CCP eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →