Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AMS-III-V-GRID-EF
AMS-III.V — Decrease of coke consumption in blast furnace by installing dust/sludge recycling system in steel works
About this methodology
Projects recycle steelworks dust and sludge into direct-reduced-iron pellets for use in blast furnaces. The method measures the reduction in coke consumption and accounts for emissions from the recycling system.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 1.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Industrial processes
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it in some cases (AMS-III.V v01 Leakage para 20, p. 7). CarbonMeld reads it in the project's documents. CM-F-AMS-III-V-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Figures set against the methodology's own values
- Integrity comparison
The small-scale limit is 60 kt CO2e per year (p. 2). CarbonMeld compares the project's annual estimate with it. CM-F-AMS-III-V-SMALL-SCALE-LIMIT
small-scale limit: 60 kt CO2e per year
Set by the methodology or the programme, not assessed by our current method
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases (AMS-III.V v01 applicability para 3, p. 1). Our current method does not assess it. CM-F-AMS-III-V-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-V-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Projects using AMS-III.V
Browse 1 published project using AMS-III.V, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AMS-III.V?
In CarbonMeld's data, AMS-III.V projects are on one registry: CDM (1 project, 0 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
