Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AM0031-GRID-EF
AM0031 — Bus rapid transit projects
About this methodology
Projects build or expand bus rapid transit systems for urban passengers. The method measures emission reductions against the transport modes passengers would otherwise use.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 8.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Transport
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (2 projects)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it (AM0031 v08.0 Leakage para 52, p. 20). CarbonMeld reads it in the project's documents. CM-F-AM0031-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
Usage rate of the devices: the methodology sets rules for it (AM0031 v08.0 baseline emissions, p. 14). Our current method does not assess it. CM-F-AM0031-USAGE
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0031-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
All 10 versions
-
v08.0adopted 27 May 2021source
Align the requirements of sampling and survey of passengers with the “Standard: Sampling and surveys for CDM project activities and programmes of activities” and the “Guideline: Sampling and surveys for CDM project activities and …
-
v07.0adopted 14 Jun 2019source
Expand the baseline scenario by adding an option for possible expansion of the existing transport system using additional vehicles; Allow the expansion of the existing BRT system; Address inconsistencies regarding the survey and equations …
-
v06.0adopted 24 Jul 2015source
Introduce a reference to the tool “Baseline emissions for modal shift measures in urban passenger transport”; Improve the approaches on additionality demonstration; Improve guidance on the renewal of the crediting period; Improve the …
-
v05.0.0adopted 23 Nov 2012source
Introduces provisions and guidance for project proponents for the renewal of the crediting period and improves the language, readability, clarity and consistency.
-
v04.0.0adopted 25 Nov 2011source
Introduces an innovative approach to additionality demonstration; Limits the crediting period to 10 years; Introduces additional formula to calculate the emission factor for the baseline bus system based on its total fuel consumption …
-
v03.1.0adopted 26 Nov 2010source
The methodology was revised to include project activities that use more gaseous fuels in the project activity than in the baseline scenario
-
v03adopted 16 Oct 2009source
The methodology was revised in response to AM_REV_0160. The revision expanded the applicability of the methodology to situations in which electricity is used in the transport systems included in the project boundary; and removed, from the …
-
v02adopted 17 Jul 2009source
The methodology was revised in response to AM_REV_0142. The revision expanded the applicability of the methodology to include situations in which the baseline public transport system and other public transport options include rail-based …
-
v01.1adopted 28 Nov 2008source
Editorial revision to introduce the parameter TRC which was missing in Equation 22.
-
v01adopted 28 Jul 2006source
Initial adoption.
Projects using AM0031
Browse 17 published projects using AM0031, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0031?
In CarbonMeld's data, AM0031 projects are on 2 registries: CDM (15) and Verra (2). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 15 | 10 | See the list |
| Verra (VCS) | 2 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet