BRT Bogotá, Colombia: TransMilenio Phase II to IV

CDM-0672 ↗

#13of 18 in Colombia#149of 213 in CDM (UNFCCC)

4.7/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

The TransMilenio BRT project in Bogotá is a well-structured transport credit under CDM methodology AM0031, with a combined additionality test and a quantified (zero) leakage deduction. However, the available record is limited to a 2012 validation report and PDD, with no monitoring or verification data, no confirmed VVB additionality sign-off, and a project-specific baseline, leaving significant evidence gaps that constrain confidence in the claimed 4.05 million tonnes of CO₂ avoided.

Red Flags

  • No verification or monitoring report found in the extracted record; total verified ERR is absent, making it impossible to confirm actual delivery against the 4,052,426 tCO₂e lifetime claim
  • Additionality test type is recorded as 'combined' but explicit VVB confirmation of the additionality assessment is not found in the available documents
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines reliability of all extracted facts
  • No buffer pool or permanence mechanism is documented for a project whose credits depend on continued BRT operation over seven years

Credit Vintages

IssuedRetiredAvailable
2007
59,020059,020
2008
69,885069,885
2009
68,813068,813
2011
79,326079,326
2012
77,691077,691
2013
156,6880156,688
Total511,4230511,423

Risk Indicators

Additionality

Combined test present; VVB sign-off not confirmed in record

Permanence

No buffer pool; no reversal data; BRT continuity risk unaddr

Leakage

Quantified and assessed as negligible (0%)

Baseline

Project-specific baseline; set 2012, current at crediting st

Safeguards

Grievance mechanism and benefit sharing present; FPIC not co

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AM0031

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents