Hebei Zhangjiakou Kangbao Tunken 2nd Phase Wind Farm Project
#224of 1935 in Renewable energy#79of 1084 in China#139of 1459 in CDM (UNFCCC)#161of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a confirmed combined additionality test and a jurisdictional grid-emission-factor baseline, which are appropriate for the technology. However, the absence of a verified ERR figure, an unexplained discrepancy between two ERR values in the same monitoring report, and a contradiction on the baseline method between the validation and monitoring reports introduce meaningful uncertainty. The project is low-risk in principle (wind displacing grid electricity) but the documentation record has notable gaps.
Red Flags
- Two different total ERR values (669,706 and 28,585) appear in the same monitoring report (2022-10-28); the relationship between them is unexplained and could indicate a data-extraction error or an unreported revision.
- The validation report (2012) describes the baseline as jurisdictional while the monitoring report (2022) labels it 'project'; for a wind project using a grid emission factor the jurisdictional characterisation is more consistent, but the discrepancy is unexplained.
- No verified ERR figure was found in any available document, making it impossible to confirm actual delivery against the 669,706 tCO₂e lifetime claim.
- Leakage justification is inconsistent: the validation report (2012) deems leakage negligible, while the monitoring report (2022) records it as 'not addressed'.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 1,221,462 | 0 | 1,221,462 | |
| Total | 1,221,462 | 0 | 1,221,462 |
Risk Indicators
Combined test confirmed by VVB
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Grid EF baseline, method label contradicts across docs
Safeguards mentioned, benefit sharing described, FPIC not st
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →