Vai al contenuto principale
GS avoidance China Vintage 2008, 2012 Documentazione completa General Methodology v2.0

BRT Zhengzhou, China

CNN-b8e468

2.8 / 10
Integrity
2.6
Transparency
3.2
Claim Safety
2.4
Documentation
3.4

Score Breakdown

Integrity

missing Additionality, baseline approach, and leakage treatment are not stated in available documents (only the methodology AMS-III.F. v12 is identified).

missing Corrective actions in the stakeholder consultation record require the VVB to verify the project start date and stakeholder process, suggesting unresolved issues at the time of documentation.

Transparency

verified No material findings are reported in the extracted record.

missing Key MRV fields (monitoring period, VVB name, and verified ERs) are not found in the extracted record.

Claim Safety

missing Over-crediting risk cannot be screened because baseline, leakage, and verified ER quantities are not available in the extracted record.

inferred CORSIA and CCP status are not stated in available documents, leaving double-claim/eligibility risk unclear.

Documentation

verified Multiple document types are referenced (issuance, stakeholder consultation, and another document), with medium extraction confidence.

missing The extracted record appears internally inconsistent (project name mismatch and a crediting-period contradiction), and several corrective actions remain open.

Detailed Analysis

Integrity

The extracted record does not include an additionality test type or confirmation by the VVB, so additionality robustness cannot be assessed from available documents. The baseline approach is also not stated, even though the methodology is identified as AMS-III.F. v12, and there is no baseline reassessment date in the extracted record. Leakage is not quantified and no leakage justification is provided in the extracted record, which is a major integrity gap for an avoidance project. The stakeholder consultation document (2024-08-10) lists corrective actions requiring the VVB to check the start date and stakeholder consultation compliance, which increases uncertainty about key eligibility conditions.

Transparency

Transparency is limited because the extracted record lacks the VVB name, monitoring period, and any claimed versus verified emission reduction totals. While the extracted record shows no material findings, it also does not provide the underlying monitoring/verification data needed to independently evaluate performance. The evidence set includes an issuance record and a stakeholder consultation record, but the core MRV fields are not found in the extracted record.

Claim Safety

Claim safety is weak because the extracted record does not provide verified ERs, baseline parameters, or leakage deductions, preventing a basic check for over-crediting. CORSIA eligibility and CCP status are not stated in available documents, so buyers cannot easily assess eligibility-related reputational risk or potential double-claim concerns. The presence of corrective actions in the stakeholder consultation record (2024-08-10) also suggests the project documentation may not have been fully settled at the time of review.

Documentation

Documentation completeness is mixed: several documents are referenced (including issuance and stakeholder consultation), and extraction confidence is medium rather than low. However, many critical fields are missing from the extracted record (VVB identity, monitoring period, ER quantities, baseline and leakage details). The stakeholder consultation document (2024-08-10) includes multiple corrective actions, indicating unresolved documentation/process issues. Additionally, the extracted project name does not match the user-provided project context, which raises concerns about document-to-project linkage in the extracted record.

Overall

Overall quality is constrained by major evidence gaps on additionality, baseline setting, leakage treatment, and verified ER quantities, which collectively elevate over-crediting and greenwashing risk. A key contradiction exists for the crediting period: the issuance record shows 2024-06-01 to 2029-05-31, while another document shows 2024-08-01 to 2029-07-31 (dated 2022-08-16). I privilege the issuance record dates because issuance is typically the authoritative registry-side record for the active crediting period, but the inconsistency still reduces confidence and lowers scores. Note: gate rules may cap the transparency score if documentation is scored below 3.0, and cap overall if integrity is below 4.0 (applied after scoring).

Audit Analysis

Based on the extracted record, core carbon-accounting elements (baseline approach, additionality demonstration, leakage treatment, and verified ERs) are not available, making it hard to judge whether credits are conservatively quantified. Safeguards are partially evidenced (a grievance mechanism is indicated), but multiple corrective actions around stakeholder consultation and start-date checks raise reliability concerns.

Project Description

Bus Rapid Transit Zhengzhou is a modern bus-based mass transit system. The project features the largest fleet of hybrid and electric buses worldwide with more than 3.100 units. The project includes 100 km of bus-only lanes, an integrated smart ticketing system, and real-time information of customers.

Red Flags

  • No verified or claimed emission reductions were found in the extracted record, limiting the ability to assess over-crediting risk.
  • Additionality and baseline approach are not stated in available documents, despite being central to an avoidance project.
  • Leakage treatment (deduction and justification) is not stated in available documents.
  • Crediting period dates conflict across documents, indicating record inconsistency.

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2008, 2012 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide the verification/monitoring report(s) stating the monitoring period, VVB name, and claimed vs verified emission reductions, including any adjustments.
  • Disclose the baseline scenario and parameters used under AMS-III.F. v12, including when the baseline was last reassessed and how baseline emissions were calculated.
  • Publish leakage assessment and any leakage deduction (or a clear justification for negligible leakage) consistent with the methodology and project context.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Additionality not evidenced

Permanence

Avoidance project (no reversal buffer indicated)

Leakage

Leakage treatment not evidenced

Baseline

Baseline approach not evidenced

Safeguards

Safeguards partially documented

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti